Summary for Test 2021-03-05-10-2
Test performed: AASHTO T51-13Project Information
Project Identifiers | Project ID: 214293 DEA: 060S4604 EFIS: 0615000038 |
---|---|
DIST-CO-RTE-PM | 06-FRE-99-R0.9/R5.0 |
Award Date | 12/05/2019 |
Closeout Date | 05/11/2023 |
Work Description | REPLACE CONCRETE AND ASPHALT PAVEMENT. |
Location Description | FRESNO COUNTY IN AND NEAR KINGSBURG AND SELMA FROM ROUTE 99/201 SEPARATION TO 0.3 MILE SOUTH OF SECOND STREET UNDERCROSSING |
QA Service Level | 1 (Verified on 08/05/2019) |
Sample Information
Sample Taken Date | 03/05/2021 | Sample Unique Key | 10 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 03/09/2021 |
Sample type | Department Acceptance | A brief description of the sample | Asphalt Binder |
The quantity of what the sample constitutes | 1 of 1 can | From where was the sample collected | Source |
First name of sampler or witnessed by | Unknown | Last name of sampler or witnessed by | Unknown |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | San Joaquin Refining Co Inc | Transportation Laboratory (TL) Number | 771405 |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Asphalt Binder | Performance Grade | PG 70-10 |
---|---|---|---|
Modified | No | Lot number | 9 |
Sublot number | 14 | Tank number | |
Time of sample | HMA Supplier | Vulcan Materials | |
Certified Asphalt Supplier | San Joaquin Refinery - Bakersfield CA | Multigrade | Not set |
Multigrade Type | Not set | Asphalt Binder Mix Number | Not set |
Test Details
DIME Sample ID: 2021-03-05-10
DIME Test ID: 2021-03-05-10-2
Testing Lab: CT HQ - Sacramento Asphalt Binder Laboratory
Test Method: AASHTO T51-13: Standard Method of Test for Ductility of Asphalt Materials (Asphalt Binder)
Test Release Date: 2021-03-15
Test Results
Is a normal test obtainable?: Yes
Number of replicates tested: One
Input Type: Measured
Tester's full name: Eva Torres
Date of test: 03/12/2021
Ductility of test #1 (D1): 148 cm
Ductility of sample: 148 cm
General comments (publicly viewable) (Max 1000 characters): Per 2018 Standard Specifications
Test was verified on 3/15/2021 ✔