Summary for Test 2021-03-03-9-1
Test performed: AASHTO T240-17Project Information
| Project Identifiers | Project ID: 209520 DEA: 06470904 EFIS: 0600000973 COOP: 061529 |
|---|---|
| DIST-CO-RTE-PM | 06-MAD-99-R7.5/15.1 |
| Award Date | 03/14/2019 |
| Closeout Date | 05/11/2023 |
| Work Description | WIDEN FREEWAY FROM 4 LANES TO 6 LANES. |
| Location Description | MADERA COUNTY IN AND NEAR MADERA FROM AVENUE 12 OVERCROSSING TO 0.9 MILE NORTH OF AVENUE 17 OVERCROSSING |
| QA Service Level | 1 (Verified on 03/16/2016) |
Sample Information
| Sample Taken Date | 03/03/2021 | Sample Unique Key | 9 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 03/09/2021 | Sample type | Department Acceptance |
| A brief description of the sample | Asphalt Binder | The quantity of what the sample constitutes | 1 of 1 can |
| From where was the sample collected | Source | First name of sampler or witnessed by | Npal |
| Last name of sampler or witnessed by | Npal | Title of sampler | TET |
| Telephone number of sampler | Laboratory sample identification | ||
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | San Joaquin Refining Co Inc | |
| Transportation Laboratory (TL) Number | 039660 | Inspector Lot Number from the Transportation Laboratory (TL) Form | |
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Asphalt Binder | Performance Grade | PG 70-10 |
|---|---|---|---|
| Modified | No | Lot number | 9 |
| Sublot number | 13 | Tank number | |
| Time of sample | HMA Supplier | Vulcan Materials | |
| Certified Asphalt Supplier | San Joaquin Refinery - Bakersfield CA | Multigrade | Not set |
| Multigrade Type | Not set | Asphalt Binder Mix Number | Not set |
| HMA Type | Not set | HMA Supplier Mix ID Number | Not set |
Test Details
DIME Sample ID: 2021-03-03-9
DIME Test ID: 2021-03-03-9-1
Testing Lab: CT HQ - Sacramento Asphalt Binder Laboratory
Test Method: AASHTO T240-17: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Test Release Date: 2021-03-12
Test Results
Is mass change based on one or two containers?: Two
Input Type: Measured
Tester's full name: Ruben Macias
Date of test: 03/11/2021
Any material loss from containers during heating process/testing?: No
Mass of empty container #1: 174.160 grams
Mass of empty container #2: 177.180 grams
Mass of container #1 before test (m1i): 209.290 grams
Mass of container #2 before test (m2i): 211.670 grams
Mass of container #1 after test (m1f): 209.290 grams
Mass of container #2 after test (m2f): 211.670 grams
Average mass change: 0.000 percent
General comments (publicly viewable) (Max 1000 characters): Per 2018 Standard Specifications
Test was verified on 3/12/2021 ✔
