Summary for Test 2021-02-12-10-2

Test performed: CTM 226-July 2010

Project Information

Project IdentifiersProject ID: 215129
DEA: 050N73U4
EFIS: 0520000166
DIST-CO-RTE-PM05-SB-101-7.3/9.6
Award Date10/22/2020
Closeout Date12/11/2023
Work Description!!Please CC Office Engineer Gabrielle Herrera on reports to RE and SR!! Segment 4C - Summerland: Construct HOV lanes and rehabilitation. Source inspection of sign structure trusses, lighting structures, steel soldier piles, epoxy coated rebar,
Location DescriptionSUMMERLAND FROM 0.2 MILES NORTH OF PARDARO LANE OVERCROSSING TO SAN YSIDRO CREEK BRIDGE
QA Service Level1 (Verified on 08/24/2020)

Sample Information

Sample Taken Date02/12/2021 Sample Unique Key10
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing02/12/2021
Sample typeQuality Control A brief description of the sample1x4 concrete aggregates
The quantity of what the sample constitutes100 cy From where was the sample collectedJob Site
First name of sampler or witnessed byScott Last name of sampler or witnessed byPowell
Title of samplerQC Technician Telephone number of sampler
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameHanson Goleta Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure nameEvans Bridge Bent 2 and 3 Footings

Material Information

Material TypeAggregate Source Identification (SMARA, name of Pit or Job Site)91-40-0003
The fabricator's/manufacturer's product name for the sample The fabricator/manufacturer designation for the sample
The plant number A detailed description of where the material sample was collectedbelt cut
Where the material sample would have been placed if not sampledEvans Bridge Bent 2 and 3 Footings Primary Aggregate Nominal Size1 inch
The concrete mix design number725A1M0P Lot number
Sublot number Aggregate Mix NumberNot set

Test Details

DIME Sample ID: 2021-02-12-10
DIME Test ID: 2021-02-12-10-2
Testing Lab: Sequoia Consultants
Test Method: CTM 226-July 2010: Method of Test for Determination of Moisture Content of Soils and Aggregates by Oven Drying
Test Release Date: 2021-02-23

Test Results


Input Type: Calculated
Tester's full name: Leo Santamaria
Date of test: 02/13/2021
Wet weight of the sample: 501.1000000000 grams
Dry weight of the sample: 466.6000000000 grams
Weight of water in sample: 34.5000000000 grams
Percent moisture: 7.4 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 2/23/2021