Summary for Test 2020-12-15-20-2

Test performed: AASHTO T51-13

Project Information

Project IdentifiersProject ID: 215023
DEA: 060U4704
EFIS: 0615000301
DIST-CO-RTE-PM06-KER,KIN-5-81.7/87.0,0.0/0.3
Award Date08/12/2020
Closeout Date06/27/2023
Work DescriptionCONSTRUCT CRCP, JPCP AND INSTALL TRAFFIC MONITORING STATIONS.
Location DescriptionKERN AND KINGS COUNTIES NEAR KETTELMAN CITY FROM 0.6 MILE SOUTH OF TWISSELMAN ROAD OVERCROSSING TO 0.3 MILE NORTH OF KERN/KINGS COUNTY LINE
QA Service Level1 (Verified on 06/17/2020)

Sample Information

Sample Taken Date12/15/2020 Sample Unique Key20
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing01/22/2021
Sample typeDepartment Acceptance A brief description of the sampleProject Sample
The quantity of what the sample constitutes1 of 1 From where was the sample collectedSource
First name of sampler or witnessed byG. Last name of sampler or witnessed byDILT
Title of sampler Telephone number of sampler
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameSPM AVENAL Transportation Laboratory (TL) NumberC040288
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeAsphalt Binder Performance GradePG 70-10
ModifiedNo Lot number
Sublot number Tank number
Time of sample HMA SupplierNot set
Certified Asphalt SupplierNot set MultigradeNot set
Multigrade TypeNot set Asphalt Binder Mix NumberNot set

Test Details

DIME Sample ID: 2020-12-15-20
DIME Test ID: 2020-12-15-20-2
Testing Lab: CT HQ - Sacramento Asphalt Binder Laboratory
Test Method: AASHTO T51-13: Standard Method of Test for Ductility of Asphalt Materials (Asphalt Binder)
Test Release Date: 2021-01-27

Test Results


Is a normal test obtainable?: Yes
Number of replicates tested: Three
Input Type: Measured
Tester's full name: Erika Gonzalez
Date of test: 01/26/2021
Ductility of test #1 (D1): 110 cm
Ductility of test #2 (D2): 150 cm
Ductility of test #3 (D3): 150 cm
Ductility of sample: 137 cm
General comments (publicly viewable) (Max 1000 characters): per 2018 specifications standards

Test was verified on 1/27/2021