Summary for Test 2020-12-03-8-11
Test performed: CTM 202-November 2011Project Information
| Project Identifiers | Project ID: 214397 DEA: 120N3204 EFIS: 1213000196 |
|---|---|
| DIST-CO-RTE-PM | 12-ORA-91-R9.8/R18.9 |
| Award Date | 11/07/2019 |
| Closeout Date | 07/01/2022 |
| Work Description | CONST PRECAST SLAB REPLACEMENT, COLD PLANE AC PVMT AND PLACE RHMA. |
| Location Description | ORANGE COUNTY IN ANAHEIM AND YORBA LINDA FROM 0.3 MILE WEST OF LAKEVIEW AVENUE OVERCROSSING TO RIVERSIDE COUNTY LINE |
| QA Service Level | 1 (Verified on 12/02/2019) |
Sample Information
| Sample Taken Date | 12/03/2020 | Sample Unique Key | 8 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 12/07/2020 |
| Sample type | Verification | A brief description of the sample | JMF 3/4" WMA-A-SP R25 0.25% LAS |
| The quantity of what the sample constitutes | 4 Bags Coldfeed Agg., 1 Bag Rap | From where was the sample collected | Manufacturer |
| First name of sampler or witnessed by | RJ Noble Orange | Last name of sampler or witnessed by | QC |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | 0686A-20 | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | R J Noble Orange | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | 91-33-0035::EAGLE VALLEY QUARRY |
|---|---|---|---|
| The fabricator's/manufacturer's product name for the sample | 3/4 WMA-A-SP R25 | The fabricator/manufacturer designation for the sample | |
| The plant number | 36R2508SPWEO | A detailed description of where the material sample was collected | Belt Cut at RJ Noble Orange Plant |
| Where the material sample would have been placed if not sampled | Asphalt Paving | Primary Aggregate Nominal Size | 3/4 inch |
| The concrete mix design number | Lot number | ||
| Sublot number | Aggregate Mix Number | Not set |
Test Details
DIME Sample ID: 2020-12-03-8
DIME Test ID: 2020-12-03-8-11
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: CTM 202-November 2011: Method of Test for Sieve Analysis of Fine and Coarse Aggregates
Test Release Date: 2021-01-20
Test Results
What size aggregate is being tested?: Combined Gradation
Individual or cumulative mass retained on each sieve?: Cumulative Mass Retained
For Combined Gradation only, has the fine aggregate sample been reduced?: No
For Combined Gradation only, use #40 Sieve?: No
Input Type: Calculated
Tester's full name: Satish Jain/Juan LeRoy
Date of test: 12/10/2020
| Sieve Size | Cumulative Percent Passing | |||||
|---|---|---|---|---|---|---|
| 100 % | ||||||
| 100 % | ||||||
| 100 % | ||||||
| 100 % | ||||||
| 100 % | ||||||
| 98 % | ||||||
| 86 % | ||||||
| 74 % | ||||||
| 48 % | ||||||
| 30 % | ||||||
| 20 % | ||||||
| 14 % | ||||||
| 9 % | ||||||
| 6 % | ||||||
| 4 % | ||||||
General comments (publicly viewable) (Max 1000 characters): Combined Aggregate Gradation W/Rap Gradation Correlation Factors
Test was verified on 1/20/2021 ✔