Summary for Test 2020-02-26-11-5
Test performed: AASHTO T283-14Project Information
| Project Identifiers | Project ID: 213411 DEA: 030H10U4 EFIS: 0317000246 |
|---|---|
| DIST-CO-RTE-PM | 03-SAC-5-9.7/24.9 |
| Award Date | 05/01/2019 |
| Closeout Date | 02/22/2024 |
| Work Description | Not set |
| Location Description | Construction on state highway in Sacramento County in and near Sacramento from 1.1 miles south of Elk Grove Boulevard to American River Viaduct |
| QA Service Level | 1 (Verified on 07/19/2019) |
Sample Information
| Sample Taken Date | 02/26/2020 | Sample Unique Key | 11 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 03/04/2020 | Sample type | Verification |
| A brief description of the sample | 3/4 " HMA-A w/RAP (Long Life, Int) | The quantity of what the sample constitutes | JMF Verification |
| From where was the sample collected | Manufacturer | First name of sampler or witnessed by | Walt (WITNESS) |
| Last name of sampler or witnessed by | Wylie (WITNESS) | Title of sampler | Granite Personnel |
| Telephone number of sampler | Laboratory sample identification | JMF20-005 | |
| Linked DIME Sample ID | 2020-02-26-13 | The fabricator/manufacturer/facility name | Granite - Valley Region Bradshaw |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | ||
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Hot Mix Asphalt | HMA Type | Type A HMA |
|---|---|---|---|
| HMA Grading | 3/4 inch | Lot number | |
| Sublot number | HMA Mix Number | Not set | |
| Binder content (%) | Not set | Virgin binder PG | Not set |
| Design binder PG | Not set | Binder Supplier | Not set |
| RAP content (%) | Not set | WMA Additives | Not set |
| Antistrip type | Not set |
Test Details
DIME Sample ID: 2020-02-26-11
DIME Test ID: 2020-02-26-11-5
Testing Lab: CT D03 - Olivehurst Northern Regional Laboratory
Test Method: AASHTO T283-14: Standard Method of Test for Resistance of Compacted Asphalt Mixtures to Moisture-Induced Damage (Moisture Content)
Test Release Date: 2021-01-08
Test Results
Unit system used?: SI Units
Input Type: Calculated
Tester's full name: Jeff Herbert
Date of test: 04/02/2020
| Wet 1 | Wet 2 | Wet 3 | Dry 1 | Dry 2 | Dry 3 | |
|---|---|---|---|---|---|---|
| Untreated | ||||||
145 psi | 187 psi | |||||
78 | ||||||
General comments (publicly viewable) (Max 1000 characters): JMF20-005. Test date estimated.
Test was verified on 1/8/2021 ✔
