Summary for Test 2015-05-12-1-2

Test performed: CTM 557-July 2012

Project Information

Project IdentifiersProject ID: 209788
DEA: 034F0704
EFIS: 0314000020
DIST-CO-RTE-PM03-SAC-50-17.1
Award Date10/31/2014
Closeout Date11/30/2017
Work DescriptionWIDEN STRUCTURE, EXTEND WEAVE LANE, AND ADD RAMP METERING.
Location DescriptionSACRAMENTO COUNTY AT NATOMA OVERHEAD
QA Service Level1 (Verified on 12/26/2014)

Sample Information

Sample Taken Date05/12/2015 Sample Unique Key1
Date that the sample was received by the laboratory/organization performing the testing05/13/2015 Sample typeQuality Assurance
A brief description of the sample6 6x12 Concrete Cylinders The quantity of what the sample constitutes6 concrete cylinders
From where was the sample collectedJob Site First name of sampler or witnessed byOleg
Last name of sampler or witnessed byKreydich Title of samplerSR
Telephone number of sampler530-204-7059 Laboratory sample identificationUnknown
Linked DIME Sample IDUnknown The fabricator/manufacturer/facility nameJobsite
Transportation Laboratory (TL) Number173232 Inspector Lot Number from the Transportation Laboratory (TL) FormUnknown
Structure unique identifier24 0120 Structure nameNatoma OH
Bid ItemNot set

Material Information

Material TypeConcrete The concrete mix design numberF628AFST0
The truck number from where the sample was collected56 The batch plant ticket number from where the sample was collected1061340
Concrete batch plantUnknown The fabricator/manufacturer designation for the sampleUnknown
A detailed description of where the material sample was collectedPump hopper into wheelbarrow Where the material sample would have been placed if not sampledNot set
From Lot No.Not set Bag Lot No.Not set

Test Details

DIME Sample ID: 2015-05-12-1
DIME Test ID: 2015-05-12-1-2
Testing Lab: CT SC - 3665 - Shingle Springs
Test Method: CTM 557-July 2012: Method of Test for Temperature of Freshly Mixed Portland Cement Concrete
Test Release Date: 2015-05-13

Test Results


Input Type: Measured
Tester's full name: OLEG KREYDICH
Date of test: 05/12/2015
Temperature of the freshly mixed concrete: 79 F
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 5/13/2015 ✔