Summary for Test 2020-10-13-45-6
Test performed: CTM 533-June 2010Project Information
| Project Identifiers | Project ID: 211260 DEA: 072159U4 EFIS: 0715000160 |
|---|---|
| DIST-CO-RTE-PM | 07-LA,ORA-5-0.0/1.5, 44.3/44.4 |
| Award Date | 05/27/2016 |
| Closeout Date | 08/01/2023 |
| Work Description | CONSTRUCT HOV LANES AND MIX FLOW LANES. |
| Location Description | LOS ANGELES AND ORANGE COUNTIES IN BUENA PARK, LA MIRADA, CERRITOS AND SANTA FE SPRINGS FROM ARTESIA BOULEVARD UNDERCROSSING TO NORTH FORK COYOTE CREEK |
| QA Service Level | 1 (Verified on 03/16/2016) |
Sample Information
| Sample Taken Date | 10/13/2020 | Sample Unique Key | 45 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 10/14/2020 | Sample type | Quality Control |
| A brief description of the sample | 6x12 concrete cylinders | The quantity of what the sample constitutes | 6 |
| From where was the sample collected | Job Site | First name of sampler or witnessed by | Julian |
| Last name of sampler or witnessed by | Carmona | Title of sampler | QC Field Technician |
| Telephone number of sampler | Unknown | Laboratory sample identification | Set 1 |
| Linked DIME Sample ID | Unknown | The fabricator/manufacturer/facility name | Jobsite |
| Transportation Laboratory (TL) Number | Unknown | Inspector Lot Number from the Transportation Laboratory (TL) Form | Unknown |
| Structure unique identifier | 00-0000 | Structure name | |
| Bid Item | Not set |
Material Information
| Material Type | Concrete | The concrete mix design number | G3-15-STR-002 |
|---|---|---|---|
| The truck number from where the sample was collected | Load 1 | The batch plant ticket number from where the sample was collected | 0 |
| Concrete batch plant | Unknown | The fabricator/manufacturer designation for the sample | Set 1 |
| A detailed description of where the material sample was collected | 736 Barrier and Sidewalk | Where the material sample would have been placed if not sampled | Unknown |
| From Lot No. | Unknown | Bag Lot No. | Unknown |
Test Details
DIME Sample ID: 2020-10-13-45
DIME Test ID: 2020-10-13-45-6
Testing Lab: G3 Quality, Incorporated - Cerritos
Test Method: CTM 533-June 2010: Method of Test for Ball Penetration in Fresh Portland Cement Concrete
Test Release Date: 2020-12-24
Test Results
Input Type: Calculated
Tester's full name: Julian Carmona
Date of test: 10/13/2020
Ball penetration in freshly mixed concrete (average): 4.75 inch
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 12/24/2020 ✔
