Summary for Test 2015-03-21-1-3
Test performed: CTM 521-November 2014Project Information
Project Identifiers | Project ID: 209217 DEA: 080F5404 EFIS: 0800000136 COOP: 081468 |
---|---|
DIST-CO-RTE-PM | 08-RIV-91,15-0.0/13.04, 35.64/45.14 |
Award Date | 09/09/2013 |
Closeout Date | 09/20/2023 |
Work Description | SR-91 Corridor Improvement Project: Develop approx. 8 miles of tolled express lanes and related improvements within SR 91 between the Riverside/Orange County line and I-15, including transition areas. |
Location Description | 08-RIV-91-0.0/13.04; 12-ORA-91-R14.43/R18.91; 08-RIV-15-35.64/45.14 |
QA Service Level | 1 (Verified on 08/07/2014) |
Sample Information
Sample Taken Date | 03/21/2015 | Sample Unique Key | 1 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 03/24/2015 |
Sample type | Quality Control | A brief description of the sample | concrete cylinders |
The quantity of what the sample constitutes | 6 | From where was the sample collected | Job Site |
First name of sampler or witnessed by | j | Last name of sampler or witnessed by | Diaz |
Title of sampler | Unknown | Telephone number of sampler | Unknown |
Laboratory sample identification | 888SRL29 | Linked DIME Sample ID | Unknown |
The fabricator/manufacturer/facility name | Rebertsons Redlands | Transportation Laboratory (TL) Number | SRL29 |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Unknown | Structure unique identifier | Unknown |
Structure name | Unknown |
Material Information
Material Type | Concrete | The concrete mix design number | SC675B39 |
---|---|---|---|
The truck number from where the sample was collected | 1651 | The batch plant ticket number from where the sample was collected | 9867960 |
Concrete batch plant | Unknown | The fabricator/manufacturer designation for the sample | Unknown |
A detailed description of where the material sample was collected | 91CIP | Where the material sample would have been placed if not sampled | Not set |
From Lot No. | Not set | Bag Lot No. | Not set |
Test Details
DIME Sample ID: 2015-03-21-1
DIME Test ID: 2015-03-21-1-3
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: CTM 521-November 2014: Method of Test for Compressive Strength of Molded Concrete Cylinders
Test Release Date: 2015-05-04
Test Results
Unit system used?: US Units
Number of specimens: 2
Test performed: With no density determined
Input Type: Measured
Tester's full name: Matthew Clayton
Date of test: 05/04/2015
Average diameter of cylinder 1: 5.98 in
Average diameter of cylinder 2: 5.98 in
Maximum load on cylinder 1: 137300 lb
Maximum load on cylinder 2: 143290 lb
Type of fracture pattern of cylinder 1: 3
Type of fracture pattern of cylinder 2: 3
Comment on any defect in either specimen or caps (Max 250 Characters): no data
Correction factor for cylinder 1: 1
Age of specimen: 44 days
Cross sectional area of cylinder 1: 28.09 in^2
Cross sectional area of cylinder 2: 28.09 in^2
Compressive strength of cylinder 1: 4887.9 psi
Compressive strength of cylinder 2: 5101.1 psi
Compressive strength (to nearest 10 psi): 4990 psi
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 5/4/2015 ✔