Summary for Test 2020-11-18-29-1

Test performed: SMTL BILST-06

Project Information

Project IdentifiersProject ID: 214114
DEA: 040A5394
EFIS: 0418000244
DIST-CO-RTE-PM04-SOL-80,12-11.4/12.8, 2.1/2.8
Award DateNot set
Closeout Date02/24/2023
Work DescriptionWiden EB SR-12 Connector, Construct 3 ramps & 2 box girder bridges, remove existing bridge, etc.
Location DescriptionI-80/I-680/Route 12 Interchange
QA Service Level1 (Verified on 04/23/2019)

Sample Information

Sample Taken Date11/18/2020 Sample Unique Key29
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing11/30/2020
Sample typeQuality Assurance A brief description of the sampleBearing Pad
The quantity of what the sample constitutes2 From where was the sample collectedManufacturer
First name of sampler or witnessed byKayla Last name of sampler or witnessed byWallace
Title of sampler Telephone number of sampler
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameDynamic Rubber Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeSMTL TM1 - Elastomeric Bearing Pad Mfg. Lot Number(s)CR55-028-20
Material/Compound/Elastomer IDna Samples Representing93
Description (size)1"x4"x6" Comments
Description (Number of Shims)0 Type of Bearing PadPlain
Description (Thickness of Shims)NA Manufacturer(s)Dynamic Rubber
Batch Numberna

Test Details

DIME Sample ID: 2020-11-18-29
DIME Test ID: 2020-11-18-29-1
Testing Lab: CT HQ - Sacramento Chemistry Laboratory
Test Method: SMTL BILST-06: (Neoprene Verification) Bilstein Test
Test Release Date: 2020-12-10

Test Results


Input Type: Calculated
Tester's full name: Mariano Pontillas
Date of test: 12/10/2020
Result: Pass
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 12/10/2020