Summary for Test 2020-11-25-3-1
Test performed: AASHTO T240-17Project Information
| Project Identifiers | Project ID: 55555 DEA: AMRL EFIS: AMRL |
|---|---|
| DIST-CO-RTE-PM | 59--- |
| Award Date | Not set |
| Closeout Date | Not set |
| Work Description | Special project for submitting Sample information for AASHTO Materials Reference Laboratory (AMRL). |
| Location Description | Not set |
| QA Service Level | NOT VERIFIED |
Sample Information
| Sample Taken Date | 11/25/2020 | Sample Unique Key | 3 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 11/30/2020 |
| Sample type | Proficiency | A brief description of the sample | Asphalt Binder PG 70-22 ER |
| The quantity of what the sample constitutes | 1 can, Due DEC, 25 | From where was the sample collected | Source |
| First name of sampler or witnessed by | AASHTO resource | Last name of sampler or witnessed by | AASHTO resource |
| Title of sampler | Oregon Cooperative Test Group | Telephone number of sampler | |
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | AASHTO resource | Transportation Laboratory (TL) Number | 308 |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Asphalt Binder | Performance Grade | PG 76-22 M |
|---|---|---|---|
| Modified | Yes | Lot number | |
| Sublot number | Tank number | Not set | |
| Time of sample | Not set | HMA Supplier | Not set |
| Certified Asphalt Supplier | Not set | Multigrade | Not set |
| Multigrade Type | Not set | Asphalt Binder Mix Number | Not set |
Test Details
DIME Sample ID: 2020-11-25-3
DIME Test ID: 2020-11-25-3-1
Testing Lab: CT HQ - Sacramento Asphalt Binder Laboratory
Test Method: AASHTO T240-17: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Test Release Date: 2020-12-09
Test Results
Is mass change based on one or two containers?: One
Input Type: Measured
Tester's full name: Harish Thaur
Date of test: 12/01/2020
Any material loss from containers during heating process/testing?: no data
Mass of empty container #1: 168.764 grams
Mass of container #1 before test (m1i): 204.315 grams
Mass of container #1 after test (m1f): 204.265 grams
Average mass change: -0.141 percent
General comments (publicly viewable) (Max 1000 characters): Per 2018 Standard Specifications
Test was verified on 12/9/2020 ✔
