Summary for Test 2024-07-23-13-5

Test performed: CTM 521-June 2020

Project Information

Project IdentifiersProject ID: 214697
DEA: 07307104
EFIS: 0714000213
DIST-CO-RTE-PM07-LA-101-32.8
Award DateNot set
Closeout DateNot set
Work DescriptionCONSTRUCT BRIDGE.
Location DescriptionLOS ANGELES COUNTY IN AND NEAR AGOURA HILLS FROM 0.1 MILE WEST OF LIBERTY CANYON ROAD UNDERCROSSING TO 0.6 MILE EAST OF PALO COMADO OVERCROSSING
QA Service Level1 (Verified on 07/12/2021)

Sample Information

Sample Taken Date07/23/2024 Sample Unique Key13
Date that the sample was received by the laboratory/organization performing the testing07/20/2024 Sample typeAcceptance
A brief description of the sample4X8 PCC cylinders The quantity of what the sample constitutes130 CY
From where was the sample collectedJob Site First name of sampler or witnessed byAna
Last name of sampler or witnessed byTrujillo Title of samplerAssistant Structure Representative
Telephone number of sampler Laboratory sample identification24-177
Linked DIME Sample ID The fabricator/manufacturer/facility nameNational Ready Mix Concrete Company
Transportation Laboratory (TL) Number072024 Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeConcrete The concrete mix design numberS72C443T1U
The truck number from where the sample was collected32 The batch plant ticket number from where the sample was collected717572
Concrete batch plantnational ready mix concrete company canoga The fabricator/manufacturer designation for the sample
A detailed description of where the material sample was collectedtruck chute Where the material sample would have been placed if not sampled
From Lot No. Bag Lot No.

Test Details

DIME Sample ID: 2024-07-23-13
DIME Test ID: 2024-07-23-13-5
Testing Lab: CT D07 - Materials Field Laboratory, Unit 1953
Test Method: CTM 521-June 2020: Method of Test for Compressive Strength of Molded Concrete Cylinders

Test results have not been published/verified or have not been released yet by the testing organization.

To make the test results available to others outside of your organization, a DIME organization manager for your organization must verify the results.