Summary for Test 2022-08-17-49-3
Test performed: CTM 216-June 2011Project Information
| Project Identifiers | Project ID: 215220 DEA: 07210624 EFIS: 0719000068 |
|---|---|
| DIST-CO-RTE-PM | 07-LA,SBD-71-1.8/R4.7&R0.0/R0.2 |
| Award Date | 02/05/2021 |
| Closeout Date | Not set |
| Work Description | PLACE STRUCTURE CONCRETE RETAINING WALLS & BOX CULVERT AND PLACE JPCP. |
| Location Description | IN LOS ANGELES AND SAN BERNARDINO COUNTIES IN POMONA AND CHINO HILLS FROM 0.2 MILE SOUTH OF MISSION BOULEVARD OVERCROSSING TO 0.2 MILE OF SAN BERNARDINO COUNTY LINE. |
| QA Service Level | 1 (Verified on 03/24/2021) |
Sample Information
| Sample Taken Date | 08/17/2022 | Sample Unique Key | 49 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 08/17/2022 | Sample type | Quality Assurance |
| A brief description of the sample | Structural Backfill | The quantity of what the sample constitutes | 300 Sq. Ft. |
| From where was the sample collected | Job Site | First name of sampler or witnessed by | Dominic |
| Last name of sampler or witnessed by | Montemayor | Title of sampler | Field Materials Tester |
| Telephone number of sampler | 19517643140 | Laboratory sample identification | 22-2155 |
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | Existing Subgrade | |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | ||
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Soil | The fabricator's/manufacturer's product name for the sample | |
|---|---|---|---|
| The fabricator/manufacturer designation for the sample | A detailed description of where the material sample was collected | In-placed material | |
| Where the material sample would have been placed if not sampled |
Test Details
DIME Sample ID: 2022-08-17-49
DIME Test ID: 2022-08-17-49-3
Testing Lab: Kleinfelder, Incorporated - Los Angeles
Test Method: CTM 216-June 2011: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates
Test results have not been published/verified or have not been released yet by the testing organization.
To make the test results available to others outside of your organization, a DIME organization manager for your organization must verify the results.
