Sample Record
Owner Lab
- CT HQ - Sacramento Structural Materials Testing Laboratory
DIME Sample ID 2021-08-03-6
Sample is locked from editing. info
Project Information
Project Identifiers | Project ID: 214702 DEA: 030F2864 EFIS: 0320000123 |
---|---|
DIST-CO-RTE-PM | 03-SAC-99-7.92 / 8.4 |
Award Date | 06/24/2020 |
Closeout Date | 11/28/2023 |
Work Description | Remove and replace Consumnes River and Consumnes River Overflow bridge |
Location Description | Sacramento County |
QA Service Level | 1 (Verified on 04/20/2020) |
Sample Information
Sample Taken Date | 08/03/2021 | Sample Unique Key | 6 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 08/03/2021 |
Sample type | Quality Assurance | A brief description of the sample | HRC 500 510 Couplers |
The quantity of what the sample constitutes | 8 | From where was the sample collected | Job Site |
First name of sampler or witnessed by | PHA | Last name of sampler or witnessed by | PHA |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | CMC Rebar, HRC | Transportation Laboratory (TL) Number | C789956 C789957 |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | SMTL TM5 - Couplers | Production or Authorization Testing | Production Testing |
---|---|---|---|
Service or Ultimate | Ultimate | Material Standard Code | ASTM A706 |
Material Grade | 60 | Rebar Manufacturer | CMC Rebar |
Coupler Manufacturer | HRC | Intermediate Assembler or Fabricator | |
Rebar Size | #10 | Coupler Model | HRC 500/510 |
Coating Standards | Uncoated | Shape of Rebar | Straight |
Rebar Hoop Diameter | Rebar Hoop Fabricator | ||
Coupler Component Heat/Lot Number(s) | 75070365 58047320/03 | Rebar Heat Number(s) | 4108361 |
Rebar Size 2 | Coupler Unique ID | Not set |
Submitted Tests
Sample File Attachments
File Name | Extension | Date Uploaded | Actions |
---|---|---|---|
No results found. |
Test File Attachments
DIME Test ID: 2021-08-03-6-1 CTM 670-December 2013 (Verified)
DIME Test ID: 2021-08-03-6-2 CTM 670-December 2013 (Verified)
DIME Test ID: 2021-08-03-6-3 CTM 670-December 2013 (Verified)
DIME Test ID: 2021-08-03-6-4 CTM 670-December 2013 (Verified)
DIME Test ID: 2021-08-03-6-5 CTM 670-December 2013 (Verified)
DIME Test ID: 2021-08-03-6-6 CTM 670-December 2013 (Verified)
DIME Test ID: 2021-08-03-6-7 CTM 670-December 2013 (Verified)
DIME Test ID: 2021-08-03-6-8 CTM 670-December 2013 (Verified)