Sample Record

Owner Lab

  • CT HQ - QASI Los Angeles Field Office

DIME Sample ID 2024-09-10-17

Sample is locked from editing. info

Project Information

Project IdentifiersProject ID: 995176
DEA: 051H3104
EFIS: 0516000060
DIST-CO-RTE-PM05-SB-154-R5.7/R6.2
Award Date01/29/2024
Closeout Date09/16/2025
Work DescriptionCONSTRUCT ROUNDABOUT, CURB RAMPS, RUMBLE STRIP AND LIGHTING SYSTEM.
Location DescriptionSANTA BARBARA COUNTY NEAR SANTA YNEZ FROM 0.3 MILE EAST OF EDISON STREET/BASELINE AVENUE TO 0.2 MILE WEST OF EDISON STREET/BASELINE AVENUE
QA Service Level1 (Verified on 10/02/2023)

Sample Information

Sample Taken Date09/10/2024 Sample Unique Key17
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing09/12/2024
Sample typeQuality Assurance A brief description of the sampleD101 and D101A Bar Splice
The quantity of what the sample constitutes4 # 5 rebar with couplers From where was the sample collectedFabricator
First name of sampler or witnessed bySubramony Last name of sampler or witnessed byKrishnamoorthy
Title of samplerQA Insepctor Telephone number of sampler9512014921
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility namePrecon Products Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) FormL88-30-2024 Structure unique identifier
Structure name Bid ItemNot set

Material Information

Material TypeSMTL TM5 - Couplers Production or Authorization TestingProduction Testing
Service or UltimateService Material Standard CodeASTM A706
Material Grade60 Rebar ManufacturerNucor
Coupler ManufacturerDayton Superior Intermediate Assembler or FabricatorPrecon
Rebar Size#5 Coupler ModelDB/DI
Coating StandardsUncoated Shape of RebarStraight
Rebar Hoop Diameter Rebar Hoop Fabricator
Coupler Component Heat/Lot Number(s)360003597122 Rebar Heat Number(s)3600035971
Rebar Size 2 5 Coupler Unique IDSF-17-01

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedDate AddedVerified?Release DateTest CommentsPrivacy LevelActions
2024-09-10-17-1CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)aauvinen, CT HQ - Sacramento Structural Materials Testing Laboratory09/19/202409/19/2024
Yes
09/19/2024Service SplicePublic - Test Data Visible
2024-09-10-17-2CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)aauvinen, CT HQ - Sacramento Structural Materials Testing Laboratory09/19/202409/19/2024
Yes
09/19/2024Service SplicePublic - Test Data Visible
2024-09-10-17-3CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)aauvinen, CT HQ - Sacramento Structural Materials Testing Laboratory09/19/202409/19/2024
Yes
09/19/2024Service SplicePublic - Test Data Visible

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2024-09-10-17-1 CTM 670-December 2013 (Verified)
DIME Test ID: 2024-09-10-17-2 CTM 670-December 2013 (Verified)
DIME Test ID: 2024-09-10-17-3 CTM 670-December 2013 (Verified)