Sample Record

DIME Sample ID 2024-08-07-111

Sample is locked from editing. info

Project Information

Project IdentifiersProject ID: 993387
DEA: 07323404
EFIS: 0716000064
DIST-CO-RTE-PM07-LA-5-R59.5/R67.9
Award Date02/25/2022
Closeout Date06/30/2026
Work DescriptionPLACE CULVERT, REPLACE DRAINAGE SYSTEM, RECONST ROADWAY & EMBANKMENT.
Location DescriptionLOS ANGELES COUNTY AT VARIOUS LOCATIONS FROM LAKE HUGHES ROAD UNDERCROSSING TO 1.9 MILES NORTH OF TEMPLIN HIGHWAY UNDERCROSSING
QA Service Level1 (Verified on 12/06/2021)

Owner Lab

  • Alta Vista Solutions - Whittier

Sample Information

Sample Taken Date08/07/2024 Sample Unique Key111
Date that the sample was received by the laboratory/organization performing the testing08/07/2024 Sample typeQuality Assurance
A brief description of the sampleA set of 3 JPCP RSC beams The quantity of what the sample constitutes10 cubic yards
From where was the sample collectedJob Site First name of sampler or witnessed byAlberto
Last name of sampler or witnessed byPineda-Gonzalez Title of sampler
Telephone number of sampler Laboratory sample identification24-2417
Linked DIME Sample ID The fabricator/manufacturer/facility nameN/A
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeConcrete The concrete mix design numberG# 21 CTS 221
The truck number from where the sample was collected The batch plant ticket number from where the sample was collected1
Concrete batch plant The fabricator/manufacturer designation for the sample
A detailed description of where the material sample was collectedwheelbarrow Where the material sample would have been placed if not sampled
From Lot No. Bag Lot No.

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedDate AddedVerified?Release DateTest CommentsPrivacy LevelActions
2024-08-07-111-1CTM 524-March 2013: Method of Test for Flexural Strength Of Rapid Strength ConcreteAlberto Pineda-Gonzalez, Alta Vista Solutions - Whittier08/17/202408/30/2024
Yes
08/30/2024Public - Test Data Visible
2024-08-07-111-2CTM 557-June 2020: Method of Test for Temperature of Freshly Mixed Hydraulic Cement ConcreteAlberto Pineda-Gonzalez, Alta Vista Solutions - Whittier08/07/202408/30/2024
Yes
08/30/2024Public - Test Data Visible

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2024-08-07-111-1 CTM 524-March 2013 (Verified)
DIME Test ID: 2024-08-07-111-2 CTM 557-June 2020 (Verified)