Sample Record
Owner Lab
- CT D08 - Fontana Southern Regional Laboratory
DIME Sample ID 2024-08-28-45
Project Information
| Project Identifiers | Project ID: 995145 DEA: 081P6804 EFIS: 0824000077 |
|---|---|
| DIST-CO-RTE-PM | 08-RIV-62-3.34/6.5 |
| Award Date | 08/28/2023 |
| Closeout Date | 11/20/2025 |
| Work Description | Remove Debris, Restore Undermined Roadway, Repair Damaged Bridge Piers) |
| Location Description | 3B08-Riv,SBd-62-R3.34/R6.5, 0.0/R2.64 4BOn HWY 62 in Riv & SBd Counties in Morongo Valley Fr 3.2 Mi W/o Indian Canyon Dr to 0.5 Mi W/o Big Morongo Canyon Rd 5B |
| QA Service Level | 1 (Verified on 09/11/2023) |
Sample Information
| Sample Taken Date | 08/28/2024 | Sample Unique Key | 45 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 08/30/2024 |
| Sample type | Quality Assurance | A brief description of the sample | CONCRETE CYLINDERS |
| The quantity of what the sample constitutes | 4 | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | VICTOR | Last name of sampler or witnessed by | WAMI |
| Title of sampler | ASR | Telephone number of sampler | |
| Laboratory sample identification | 1071-01 | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | NOT PROVIDED | Transportation Laboratory (TL) Number | 178679 |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Concrete | The concrete mix design number | NOT PROVIDED |
|---|---|---|---|
| The truck number from where the sample was collected | NOT PROVIDED | The batch plant ticket number from where the sample was collected | NOT PROVIDED |
| Concrete batch plant | The fabricator/manufacturer designation for the sample | ||
| A detailed description of where the material sample was collected | MISSION CHANNEL OF. - CUT OFF WALL, RIGHT BRIDGE | Where the material sample would have been placed if not sampled | |
| From Lot No. | Bag Lot No. |
Submitted Tests
Sample File Attachments
| File Name | Extension | Date Uploaded | Actions |
|---|---|---|---|
| No results found. | |||
Test File Attachments
DIME Test ID: 2024-08-28-45-1 ASTM C39-10 (Verified)
DIME Test ID: 2024-08-28-45-2 ASTM C39-10 (Verified)
