Sample Record

DIME Sample ID 2024-08-28-29

Project Information

Project IdentifiersProject ID: 995028
DEA: 010H4314
EFIS: 0117000214
DIST-CO-RTE-PM01-HUM-299-R11.0/R11.4
Award Date09/26/2023
Closeout Date09/05/2025
Work DescriptionProject Name: Korbel Wall (Description of Work: CONSTRUCT RETAINING WALL, RECONSTRUCT ROADWAY, & REPLACE CULVERT)
Location DescriptionHUMBOLDT COUNTY ABOUT 6 MILES EAST OF BLUE LAKE FROM NORTH FORK MAD RIVER BRIDGE TO 0.4 MILE EAST OF NORTH FORK MAD RIVER BRIDGE
QA Service Level1 (Verified on 08/07/2023)

Owner Lab

  • CT D01 - District 1 Materials Laboratory

Sample Information

Sample Taken Date08/28/2024 Sample Unique Key29
Date that the sample was received by the laboratory/organization performing the testing08/29/2024 Sample typeAcceptance
A brief description of the sampleType II-V Cement The quantity of what the sample constitutes50 CY
From where was the sample collectedJob Site First name of sampler or witnessed bySam
Last name of sampler or witnessed byKaplan Title of samplerASR
Telephone number of sampler(707)496-0826 Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nameEureka Ready mix
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier12-0E0058 Structure nameKorbel Wall
Bid ItemNot set

Material Information

Material TypeConcrete The concrete mix design numberE400F
The truck number from where the sample was collectedLoad 2 Truck 84 The batch plant ticket number from where the sample was collected38149
Concrete batch plantArcata Eureka Ready Mix The fabricator/manufacturer designation for the sampleBatch
A detailed description of where the material sample was collectedConcrete Truck Chute Where the material sample would have been placed if not sampledWaler 3
From Lot No. Bag Lot No.

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedDate AddedVerified?Release DateTest CommentsPrivacy LevelActions
2024-08-28-29-1CTM 557-July 2012: Method of Test for Temperature of Freshly Mixed Portland Cement ConcreteAndrew Grinsell, CT D01 - District 1 Materials Laboratory08/28/202408/29/2024
Yes
08/29/2024Public - Test Data Visible
2024-08-28-29-2CTM 556-January 2018: Method of Test for Slump of Fresh Portland Cement ConcreteSam Kaplan, CT D01 - District 1 Materials Laboratory08/28/202408/29/2024
Yes
08/29/2024Public - Test Data Visible
2024-08-28-29-7CTM 521-June 2020: Method of Test for Compressive Strength of Molded Concrete CylindersLeif Ayres, CT D01 - District 1 Materials Laboratory08/31/202408/31/2024
Yes
08/31/20243 Day Break 8/31/24Public - Test Data Visible
2024-08-28-29-8CTM 521-June 2020: Method of Test for Compressive Strength of Molded Concrete CylindersJamie Kelley, CT D01 - District 1 Materials Laboratory09/04/202409/04/2024
Yes
09/04/20247 Day Break 9/4/24Public - Test Data Visible
2024-08-28-29-9CTM 521-June 2020: Method of Test for Compressive Strength of Molded Concrete CylindersJamie Kelley, CT D01 - District 1 Materials Laboratory09/25/202409/25/2024
Yes
09/25/202428 Day Break 9/25/24Public - Test Data Visible

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2024-08-28-29-1 CTM 557-July 2012 (Verified)
DIME Test ID: 2024-08-28-29-2 CTM 556-January 2018 (Verified)
DIME Test ID: 2024-08-28-29-7 CTM 521-June 2020 (Verified)
DIME Test ID: 2024-08-28-29-8 CTM 521-June 2020 (Verified)
DIME Test ID: 2024-08-28-29-9 CTM 521-June 2020 (Verified)