Sample Record

DIME Sample ID 2024-08-02-3

Project Information

Project IdentifiersProject ID: 1000409
DEA: 051S1604
EFIS: 0524000176
DIST-CO-RTE-PM05-MON-1-60
Award Date06/14/2024
Closeout Date08/21/2026
Work DescriptionRocky Creek Slip Out Permanent Restoration Project
Location DescriptionNot set
QA Service Level1 (Verified on 06/26/2024)

Owner Lab

  • CT HQ - QASI Los Angeles Field Office

Sample Information

Sample Taken Date08/02/2024 Sample Unique Key3
Date that the sample was received by the laboratory/organization performing the testingNot set Sample typeQuality Control
A brief description of the sample#8 x 4' diameter hoops The quantity of what the sample constitutes384
From where was the sample collectedFabricator First name of sampler or witnessed bySteve
Last name of sampler or witnessed byHall Title of samplerCT METS QA INSPECTOR
Telephone number of sampler9152961869 Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nameRKR Steel Welding
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) FormL134-036-24
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeSMTL TM5 - Welded Hoops Production or Authorization TestingProduction Testing
Service or UltimateUltimate Rebar Heat Number(s)125424
Hoop Manufacturer Lot Number(s)1, 2 and 3 Material Standard CodeASTM A706
Material Grade60 Rebar Size#8
Diameter of Hoop4'-0" Epoxy CoatedNo
Epoxy Coating ColorNA Rebar ManufacturerCascade - Oregon
Welding CompanyRKR Steel Welding Coating StandardsUncoated
Weld TypeFlash Welded

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedDate AddedVerified?Release DateTest CommentsPrivacy LevelActions
No results found.

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments