Sample Record

DIME Sample ID 2024-06-19-101

Project Information

Project IdentifiersProject ID: 995169
DEA: 081K4024
EFIS: 0820000074
COOP: 081701
DIST-CO-RTE-PM08-RIV-I-15-3.9
Award Date12/12/2023
Closeout DateNot set
Work DescriptionConstruction of 12 ft wide aux lane with 10 ft right shoulder on northbound I-15. Embankment excavation and construction of retaining wall in front of Santiago Road overcrossing abutment.
Location DescriptionNB I-15 between Temecula Parkway and Rancho California Road
QA Service Level2 (Verified on 09/21/2023)

Owner Lab

  • CT D08 - Fontana Southern Regional Laboratory

Sample Information

Sample Taken Date06/19/2024 Sample Unique Key101
Date that the sample was received by the laboratory/organization performing the testing06/26/2024 Sample typeVerification
A brief description of the sample3/4" HMA-A-SP 0.25% EVO The quantity of what the sample constitutes24 BOXES OF HMA, 4 QTS OF PG64-16, 3 BAGS OF COMBINED AGG, 2 BAGS OF RAP
From where was the sample collectedManufacturer First name of sampler or witnessed byJacob
Last name of sampler or witnessed byMCPHERSON Title of sampler
Telephone number of sampler Laboratory sample identification0306A-24
Linked DIME Sample ID The fabricator/manufacturer/facility nameR.J. NOBLE - CORONA
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeHot Mix Asphalt HMA TypeType A HMA
HMA Grading3/4 inch Lot number
Sublot number HMA Mix Number36R2503SPWEC
Binder content (%)Not set Virgin binder PGNot set
Design binder PGNot set Binder SupplierNot set
RAP content (%)Not set WMA AdditivesNot set
Antistrip typeNot set

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedDate AddedVerified?Release DateTest CommentsPrivacy LevelActions
No results found.

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments