Sample Record

DIME Sample ID 2024-06-17-91

Project Information

Project IdentifiersProject ID: 995487
DEA: 043W7604
EFIS: 0422000033
DIST-CO-RTE-PM04-SOL-37-R7.3/R8.0
Award Date03/11/2024
Closeout Date11/27/2024
Work DescriptionPOLYESTER CONCRETE OVERLAY.
Location DescriptionSOLANO COUNTY IN AND NEAR VALLEJO FROM 0.2 MILE EAST OF WALNUT STREET OVERCROSSING TO 0.5 MILE WEST OF SACRAMENTO STREET OVERCROSSING
QA Service Level1 (Verified on 11/27/2023)

Owner Lab

  • CT D04 - Concord Field Laboratory

Sample Information

Sample Taken Date06/17/2024 Sample Unique Key91
Date that the sample was received by the laboratory/organization performing the testing06/17/2024 Sample typeQuality Assurance
A brief description of the sampleRelative Compaction of Polymer Concrete The quantity of what the sample constitutes100 syd
From where was the sample collectedFabricator First name of sampler or witnessed byNick
Last name of sampler or witnessed byHall Title of samplerLab Technician
Telephone number of sampler7072999133 Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nameACC
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypePolyester Mfg. Lot Number(s)1
Batch Number1 Mix number1

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedDate AddedVerified?Release DateTest CommentsPrivacy LevelActions
2024-06-17-91-1CTM 552-December 2013: Method of Test for Relative Compaction of Polymer Concrete Utilizing Nuclear GagesNicholas Hall, CT D04 - Concord Field Laboratory06/17/202406/25/2024
Yes
06/25/2024The results are and average of 3 resultsPublic - Test Data Visible

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2024-06-17-91-1 CTM 552-December 2013 (Verified)