Sample Record

Owner Lab

  • G3 Quality, Incorporated - Cerritos

DIME Sample ID 2024-04-06-27

Sample is locked from editing. info

Project Information

Project IdentifiersProject ID: 994425
DEA: 040K5204
EFIS: 0416000098
DIST-CO-RTE-PM04-SON-12-11.0/T17.4
Award Date03/21/2023
Closeout DateNot set
Work DescriptionOverlay with RHMA, replace guardrails, approach slabs and signs.
Location DescriptionConstruction on State Highway in Sonoma County from Llano Road to Farmers Lane.
QA Service Level1 (Verified on 12/07/2022)

Sample Information

Sample Taken Date04/06/2024 Sample Unique Key27
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing04/07/2024
Sample typeQuality Control A brief description of the sample6X12 Concrete Cylinders
The quantity of what the sample constitutes4 From where was the sample collectedJob Site
First name of sampler or witnessed byBenjamin Last name of sampler or witnessed byBasquez
Title of samplerQC Field Technician Telephone number of sampler
Laboratory sample identificationHE4X12BM, Set 8 Linked DIME Sample IDUnknown
The fabricator/manufacturer/facility nameVanguard Construction Transportation Laboratory (TL) NumberUnknown
Inspector Lot Number from the Transportation Laboratory (TL) FormUnknown Structure unique identifier00-0000
Structure name

Material Information

Material TypeConcrete The concrete mix design numberHE4X12BM
The truck number from where the sample was collectedLoad 37 The batch plant ticket number from where the sample was collected0
Concrete batch plantUnknown The fabricator/manufacturer designation for the sampleSet 8
A detailed description of where the material sample was collectedTruck chute at 335 yards, Plant B Set 4 Where the material sample would have been placed if not sampledUnknown
From Lot No.1 Bag Lot No.1

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedSubmitted ByVerified?Release DateTest CommentsActions
2024-04-06-27-1CTM 521-June 2020: Method of Test for Compressive Strength of Molded Concrete CylindersBenjamin Basquez, G3 Quality, Incorporated - Cerritos04/07/2024Ricky Pham
Yes
06/05/2024
2024-04-06-27-2CTM 521-June 2020: Method of Test for Compressive Strength of Molded Concrete CylindersTravis Van-Y, G3 Quality, Incorporated - Cerritos05/05/2024Ricky Pham
Yes
06/05/2024
2024-04-06-27-3CTM 557-June 2020: Method of Test for Temperature of Freshly Mixed Hydraulic Cement ConcreteBenjamin Basquez, G3 Quality, Incorporated - Cerritos04/06/2024Ricky Pham
Yes
06/05/2024
2024-04-06-27-4CTM 518-June 2010: Method of Test for Unit Weight of Fresh ConcreteBenjamin Basquez, G3 Quality, Incorporated - Cerritos04/06/2024Ricky Pham
Yes
06/05/2024
2024-04-06-27-5CTM 504-June 2010: Method of Test for Determining Air Content of Freshly Mixed Concrete by the Pressure MethodBenjamin Basquez, G3 Quality, Incorporated - Cerritos04/06/2024Ricky Pham
Yes
06/05/2024
2024-04-06-27-6CTM 533-June 2010: Method of Test for Ball Penetration in Fresh Portland Cement ConcreteBenjamin Basquez, G3 Quality, Incorporated - Cerritos04/06/2024Ricky Pham
Yes
06/05/2024

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2024-04-06-27-1 CTM 521-June 2020 (Verified)
DIME Test ID: 2024-04-06-27-2 CTM 521-June 2020 (Verified)
DIME Test ID: 2024-04-06-27-3 CTM 557-June 2020 (Verified)
DIME Test ID: 2024-04-06-27-4 CTM 518-June 2010 (Verified)
DIME Test ID: 2024-04-06-27-5 CTM 504-June 2010 (Verified)
DIME Test ID: 2024-04-06-27-6 CTM 533-June 2010 (Verified)