Sample Record

DIME Sample ID 2024-06-04-41

Sample is locked from editing. info

Project Information

Project IdentifiersProject ID: 993141
DEA: 060V1204
EFIS: 0616000207
DIST-CO-RTE-PM06-MAD-99-R6.9/R7.6
Award Date06/22/2022
Closeout Date12/02/2025
Work DescriptionCottonwood Creek Bridge Replacement - REPLACE BRIDGES AND CONSTRUCT RETAINING WALLS.
Location DescriptionMADERA COUNTY NEAR MADERA FROM 0.4 MILE SOUTH OF COTTONWOOD CREEK BRIDGE TO 0.1 MILE NORTH OF AVENUE 12 OVERCROSSING
QA Service Level1 (Verified on 07/28/2021)

Owner Lab

  • CT D06 - Millbrook Field Laboratory

Sample Information

Sample Taken Date06/04/2024 Sample Unique Key41
Date that the sample was received by the laboratory/organization performing the testing06/05/2024 Sample typeQuality Assurance
A brief description of the sampleType II Cement The quantity of what the sample constitutes26 CY
From where was the sample collectedJob Site First name of sampler or witnessed byJuan
Last name of sampler or witnessed byDe La Torre Title of samplerASR
Telephone number of sampler559-363-0082 Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nameCVC Chowchilla
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure nameSign Structure @104
Bid ItemNot set

Material Information

Material TypeConcrete The concrete mix design number323802
The truck number from where the sample was collected3 The batch plant ticket number from where the sample was collected169612
Concrete batch plantChowchilla The fabricator/manufacturer designation for the sampleCentral Valley Concrete
A detailed description of where the material sample was collectedTAIL GATE Where the material sample would have been placed if not sampledCIDH pile
From Lot No. Bag Lot No.

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedDate AddedVerified?Release DateTest CommentsPrivacy LevelActions
2024-06-04-41-1CTM 521-June 2020: Method of Test for Compressive Strength of Molded Concrete CylindersTomas Silva, CT D06 - Millbrook Field Laboratory07/03/202407/03/2024
Yes
07/03/2024Public - Test Data Visible

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2024-06-04-41-1 CTM 521-June 2020 (Verified)