Sample Record

DIME Sample ID 2024-05-06-25

Sample is locked from editing. info

Project Information

Project IdentifiersProject ID: 995257
DEA: 09401004
EFIS: 0924000007
DIST-CO-RTE-PM09-INY-190-9.8-68.0
Award Date08/21/2023
Closeout Date03/13/2025
Work DescriptionEmergency Repair from Flood Damage to State Route 190 near Olancha, CA.
Location DescriptionState Route 190
QA Service Level1 (Verified on 10/19/2023)

Owner Lab

  • CT D09 - Bishop Field Laboratory

Sample Information

Sample Taken Date05/06/2024 Sample Unique Key25
Date that the sample was received by the laboratory/organization performing the testing05/08/2024 Sample typeDepartment Acceptance
A brief description of the sample3/4" HMA for Gradation The quantity of what the sample constitutesBox of HMA Post Plant
From where was the sample collectedSource First name of sampler or witnessed byDerek
Last name of sampler or witnessed byCarrington Title of samplerMREAS
Telephone number of sampler7609208313 Laboratory sample identification3886
Linked DIME Sample IDHMA-01 The fabricator/manufacturer/facility nameGranite 5 Bridges Plant
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeAggregate Source Identification (SMARA, name of Pit or Job Site)00-00-0000
The fabricator's/manufacturer's product name for the sample The fabricator/manufacturer designation for the sample
The plant number A detailed description of where the material sample was collectedHMA Windrow
Where the material sample would have been placed if not sampled Primary Aggregate Nominal Size3/4 inch
The concrete mix design number Lot number
Sublot number Aggregate Mix Number

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedDate AddedVerified?Release DateTest CommentsPrivacy LevelActions
2024-05-06-25-1AASHTO T30-19: Standard Method of Test for Mechanical Analysis of Extracted Aggregate (Mechanical Analysis)Derek Carrington, CT D09 - Bishop Field Laboratory05/08/202405/09/2024
Yes
05/09/2024HMA-01 Post Plant GradationPublic - Test Data Visible

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2024-05-06-25-1 AASHTO T30-19 (Verified)