Sample Record
Owner Lab
- CT D06 - Bakersfield Field Laboratory
DIME Sample ID 2024-03-11-1
Project Information
Project Identifiers | Project ID: 215425 DEA: 06360244 EFIS: 0613000005 |
---|---|
DIST-CO-RTE-PM | 06-TUL-99-30.6/35.2 |
Award Date | 04/23/2021 |
Closeout Date | Not set |
Work Description | Widen Freeway & Bridge Construction (Concrete Bridge) |
Location Description | Not set |
QA Service Level | 1 (Verified on 11/01/2021) |
Sample Information
Sample Taken Date | 03/11/2024 | Sample Unique Key | 1 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | No | Date that the sample was received by the laboratory/organization performing the testing | 03/11/2024 |
Sample type | Quality Assurance | A brief description of the sample | Class 2 Aggregate Base |
The quantity of what the sample constitutes | Day's Production | From where was the sample collected | Job Site |
First name of sampler or witnessed by | CT Inspector | Last name of sampler or witnessed by | QC |
Title of sampler | QA Inspector | Telephone number of sampler | |
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | Selma SPC Site | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | 0613000005 |
---|---|---|---|
The fabricator's/manufacturer's product name for the sample | The fabricator/manufacturer designation for the sample | ||
The plant number | A detailed description of where the material sample was collected | Windrow - SB 99 STA 191+00 | |
Where the material sample would have been placed if not sampled | Primary Aggregate Nominal Size | 3/4 inch | |
The concrete mix design number | Lot number | ||
Sublot number | Aggregate Mix Number |
Submitted Tests
Sample File Attachments
File Name | Extension | Date Uploaded | Actions |
---|---|---|---|
No results found. |
Test File Attachments
DIME Test ID: 2024-03-11-1-1 CTM 202-November 2011 (Verified)
File Name | Extension | Date Uploaded | Test ID | Actions |
---|---|---|---|---|
06-360244_37042_240311_81_Class2AB | 03/11/2024 | 2024-03-11-1-1 | Info |
DIME Test ID: 2024-03-11-1-2 CTM 217-June 2011 (Verified)
File Name | Extension | Date Uploaded | Test ID | Actions |
---|---|---|---|---|
06-360244_37042_240311_81_Class2AB | 03/11/2024 | 2024-03-11-1-2 | Info |