Sample Record

Owner Lab

  • CT HQ - QASI Los Angeles Field Office

DIME Sample ID 2024-01-26-13

Sample is locked from editing. info

Project Information

Project IdentifiersProject ID: 213457
DEA: 11430434
EFIS: 1118000197
DIST-CO-RTE-PM11-SD-8-12.9/14.6,14.9
Award Date07/16/2022
Closeout Date08/21/2025
Work DescriptionHMA, STRUCTURAL BRIDGE, POLYESTER CONC OVERLAY, JPCP, & CONC BARRIER.
Location DescriptionSAN DIEGO COUNTY IN LA MESA AND EL CAJON FROM 0.1 MILE WEST OF GROSSMONT BOULEVARD OVERCROSSING TO WEST MAIN STREET OVERCROSSING AND AT MARSHALL AVENUE OVERHEAD
QA Service Level1 (Verified on 06/22/2018)

Sample Information

Sample Taken Date01/26/2024 Sample Unique Key13
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing01/31/2024
Sample typeQuality Assurance A brief description of the sampleBarsplice Griptwist coupler
The quantity of what the sample constitutes36 pcs From where was the sample collectedJob Site
First name of sampler or witnessed byJoaquin Last name of sampler or witnessed byMoreno
Title of sampler Telephone number of sampler7146990897
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameBarsplice Integrity Rebar Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name Bid ItemNot set

Material Information

Material TypeSMTL TM5 - Couplers Production or Authorization TestingProduction Testing
Service or UltimateUltimate Material Standard CodeASTM A706
Material Grade60 Rebar ManufacturerCascade Steel
Coupler ManufacturerBarSplice Intermediate Assembler or FabricatorIntegrity Rebar
Rebar Size#6 Coupler ModelGrip Twist taper thread male and female
Coating StandardsUncoated Shape of RebarStraight
Rebar Hoop Diameter Rebar Hoop Fabricator
Coupler Component Heat/Lot Number(s)A214592 Rebar Heat Number(s)273422
Rebar Size 2 Coupler Unique IDSS-17-03

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedDate AddedVerified?Release DateTest CommentsPrivacy LevelActions
2024-01-26-13-1CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)aauvinen, CT HQ - Sacramento Structural Materials Testing Laboratory02/01/202402/01/2024
Yes
02/01/2024Ok NeckingPublic - Test Data Visible
2024-01-26-13-2CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)aauvinen, CT HQ - Sacramento Structural Materials Testing Laboratory02/01/202402/01/2024
Yes
02/01/2024Ok NeckingPublic - Test Data Visible
2024-01-26-13-3CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)aauvinen, CT HQ - Sacramento Structural Materials Testing Laboratory02/01/202402/01/2024
Yes
02/01/2024Ok NeckingPublic - Test Data Visible

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2024-01-26-13-1 CTM 670-December 2013 (Verified)
DIME Test ID: 2024-01-26-13-2 CTM 670-December 2013 (Verified)
DIME Test ID: 2024-01-26-13-3 CTM 670-December 2013 (Verified)