Sample Record

DIME Sample ID 2023-10-31-69

Project Information

Project IdentifiersProject ID: 214649
DEA: 07316004
EFIS: 0715000194
DIST-CO-RTE-PM07-LA-14-60.70
Award Date02/07/2023
Closeout DateNot set
Work DescriptionREHABILITATION FOR THE ON/OFF RAMPS AND ADJACENT SHOULDERS. UPGRADING METAL BEAM GUARDRAILS, AC DIKES, SIGN PANELS, CURB RAMPS, TRAFFIC LOOPS DETECTORS, AND SOME OTHER HIGHWAY APPURTENANCES.
Location DescriptionROUTE 14 FROM PALMDALE BLVD TO KERN COUNTRY LINE.
QA Service Level1 (Verified on 01/29/2020)

Owner Labs

  • Kleinfelder, Incorporated - Los Angeles
  • Alta Vista Solutions - Whittier

Sample Information

Sample Taken Date10/31/2023 Sample Unique Key69
Date that the sample was received by the laboratory/organization performing the testing11/01/2023 Sample typeQuality Assurance
A brief description of the sample6 x 12 LCB Cylinders The quantity of what the sample constitutes10 CY
From where was the sample collectedJob Site First name of sampler or witnessed byDominic
Last name of sampler or witnessed byMontemayor Title of sampler
Telephone number of sampler Laboratory sample identification23-1875, 23-1876, 23-1877
Linked DIME Sample ID The fabricator/manufacturer/facility nameN/A
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeConcrete The concrete mix design numberLCB300
The truck number from where the sample was collected The batch plant ticket number from where the sample was collected880974
Concrete batch plant The fabricator/manufacturer designation for the sample
A detailed description of where the material sample was collectedConcrete from wheelbarrow Where the material sample would have been placed if not sampled
From Lot No. Bag Lot No.

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedDate AddedVerified?Release DateTest CommentsPrivacy LevelActions
2023-10-31-69-1CTM 521-June 2020: Method of Test for Compressive Strength of Molded Concrete CylindersCameron Messa, Alta Vista Solutions - Whittier11/07/202311/17/2023
Yes
11/17/2023Public - Test Data Visible
2023-10-31-69-2CTM 557-June 2020: Method of Test for Temperature of Freshly Mixed Hydraulic Cement ConcreteDominic Montemayor, Alta Vista Solutions - Whittier10/31/202311/17/2023
Yes
11/17/2023Public - Test Data Visible

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2023-10-31-69-1 CTM 521-June 2020 (Verified)
DIME Test ID: 2023-10-31-69-2 CTM 557-June 2020 (Verified)