Sample Record

DIME Sample ID 2023-11-09-52

Sample is locked from editing. info

Project Information

Project IdentifiersProject ID: 209820
DEA: 04297634
EFIS: 0415000040
COOP: 042548
DIST-CO-RTE-PM04-ALA-84,680-17.9/21
Award Date02/19/2021
Closeout DateNot set
Work DescriptionROUTE 84 WIDENING (4-LANE EXPRESSWAY) FROM I-680 TO PIGEON PASS, INCLUDING INTERSECTION, DRAINAGE IMPROVEMENTS AND UTILITY RELOCATION.
Location DescriptionALAMEDA COUNTY IN AND NEAR SUNOL, PLEASANTON, AND LIVERMORE ON ROUTE 84 FROM 0.1 MILE EAST OF ROUTE 680 TO 0.1 MILE SOUTH OF RUBY HILL DRIVE AND ON ROUTE 680 FROM 1.2 MILES SOUTH TO 1.8 MILES NORTH OF ROUTE 84
QA Service Level1 (Verified on 11/04/2019)

Owner Lab

  • CT SC - 3674 - Livermore

Sample Information

Sample Taken Date11/09/2023 Sample Unique Key52
Date that the sample was received by the laboratory/organization performing the testing12/27/2023 Sample typeQuality Assurance
A brief description of the sample#11 HRC xtender 500/510 couplers The quantity of what the sample constitutes2 sets of 4 test bars
From where was the sample collectedJob Site First name of sampler or witnessed byMarcos
Last name of sampler or witnessed byLopez Title of samplerASR
Telephone number of sampler510-496-9610 Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nameHRC Fountain Valley
Transportation Laboratory (TL) Number031627 Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier01-330386L Structure nameSB Koopman
Bid ItemNot set

Material Information

Material TypeSMTL TM5 - Couplers Production or Authorization TestingProduction Testing
Service or UltimateService Material Standard CodeASTM A706
Material Grade60 Rebar ManufacturerVinton Steel, CMC Steel OK, CMC Steel AZ
Coupler ManufacturerHRC Fountian Valley CA Intermediate Assembler or Fabricator
Rebar Size#11 Coupler ModelHRC Xtender XT 500/510
Coating StandardsUncoated Shape of RebarStraight
Rebar Hoop Diameter Rebar Hoop Fabricator
Coupler Component Heat/Lot Number(s)73126937 and 73130586 Rebar Heat Number(s)2212350, 6039401, 4133769
Rebar Size 2 11 Coupler Unique IDTP-17-01

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedDate AddedVerified?Release DateTest CommentsPrivacy LevelActions
2023-11-09-52-1CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile Slip)Andrew Auvinen, CT HQ - Sacramento Structural Materials Testing Laboratory12/19/202312/19/2023
Yes
12/28/2023Public - Test Data Visible

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2023-11-09-52-1 CTM 670-December 2013 (Verified)