Sample Record

DIME Sample ID 2023-11-10-20

Sample is locked from editing. info

Project Information

Project IdentifiersProject ID: 215425
DEA: 06360244
EFIS: 0613000005
DIST-CO-RTE-PM06-TUL-99-30.6/35.2
Award Date04/26/2021
Closeout Date08/31/2026
Work DescriptionWiden Freeway & Bridge Construction (Concrete Bridge)
Location DescriptionNot set
QA Service Level1 (Verified on 11/01/2021)

Owner Lab

  • CT D06 - Bakersfield Field Laboratory

Sample Information

Sample Taken Date11/10/2023 Sample Unique Key20
Date that the sample was received by the laboratory/organization performing the testing11/10/2023 Sample typeQuality Assurance
A brief description of the sampleClass2 AB The quantity of what the sample constitutes2000 sq ft per CTM 231
From where was the sample collectedJob Site First name of sampler or witnessed byDoug
Last name of sampler or witnessed byRuff Title of samplerMaterials Tester
Telephone number of sampler Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nameJobsite
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeSoil The fabricator's/manufacturer's product name for the sample
The fabricator/manufacturer designation for the sample A detailed description of where the material sample was collectedTest holes at jobsite
Where the material sample would have been placed if not sampled

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedDate AddedVerified?Release DateTest CommentsPrivacy LevelActions
2023-11-10-20-1CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear GagesDoug Ruff, CT D06 - Bakersfield Field Laboratory11/10/202311/13/2023
Yes
11/13/2023Sta 217+20 to 211+20 elevation: 0.95ft width: 30 ftPublic - Test Data Visible

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2023-11-10-20-1 CTM 231-March 2013 (Verified)
File NameExtensionDate UploadedTest IDActions
06-360244_37000_231110_543to546pdf11/13/20232023-11-10-20-1   Info