Sample Record

Owner Lab

  • Sequoia Consultants

DIME Sample ID 2023-05-19-113

Sample is locked from editing. info

Project Information

Project IdentifiersProject ID: 993811
DEA: 11422304
EFIS: 1115000180
DIST-CO-RTE-PM11-SD-78-0.3/R16.0
Award Date10/28/2022
Closeout DateNot set
Work DescriptionCULVERT REPAIRS, COLD PLANE, RHMA-G, MODIFY LANDSCAPE AND ELECTRICAL.
Location DescriptionSAN DIEGO COUNTY AT VARIOUS LOCATIONS FROM 0.3 MILE EAST OF ROUTE 78/5 SEPARATION TO 0.5 MILE WEST OF ROUTE 15/78 SEPARATION
QA Service Level1 (Verified on 06/13/2022)

Sample Information

Sample Taken Date05/19/2023 Sample Unique Key113
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing05/20/2023
Sample typeQuality Control A brief description of the samplestructural concrete
The quantity of what the sample constitutes2 cylinders From where was the sample collectedJob Site
First name of sampler or witnessed byRodrigo Last name of sampler or witnessed byLupian
Title of sampler Telephone number of sampler
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameRobertsons-Escondido Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeConcrete The concrete mix design numberRRM20036
The truck number from where the sample was collected The batch plant ticket number from where the sample was collected7682728
Concrete batch plant The fabricator/manufacturer designation for the sample
A detailed description of where the material sample was collectedDS30 Junction Structure I-78 Median east of Twin Oaks Valley Rd Where the material sample would have been placed if not sampled
From Lot No. Bag Lot No.

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedSubmitted ByVerified?Release DateTest CommentsActions
2023-05-19-113-1CTM 521-June 2020: Method of Test for Compressive Strength of Molded Concrete CylindersEddie Mendez, Sequoia Consultants06/16/2023Cassidy Pham
Yes
11/07/2023

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2023-05-19-113-1 CTM 521-June 2020 (Verified)