Sample Record

DIME Sample ID 2023-11-04-16

Project Information

Project IdentifiersProject ID: 994166
DEA: 051H8104
EFIS: 0516000164
DIST-CO-RTE-PM05-SBT-25-18.8/19.2
Award Date01/06/2023
Closeout Date07/31/2024
Work DescriptionROADWAY EXCAVATION, HMA, CULVERTS AND SIGNAL SYSTEM.
Location DescriptionSAN BENITO COUNTY ABOUT 32 MILES SOUTH OF HOLLISTER FROM 0.8 MILE NORTH OF SAN BENITO LATERAL TO 2 MILES SOUTH OF ROUTE 146
QA Service Level1 (Verified on 08/17/2022)

Owner Lab

  • CT D05 - Monterey Construction Field Laboratory

Sample Information

Sample Taken Date11/04/2023 Sample Unique Key16
Date that the sample was received by the laboratory/organization performing the testing11/07/2023 Sample typeQuality Assurance
A brief description of the sampleSS-1H The quantity of what the sample constitutes1 JG
From where was the sample collectedJob Site First name of sampler or witnessed byAnthony
Last name of sampler or witnessed byRomiza Title of sampler
Telephone number of sampler Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility namePacific Northwest Oil - Stockton, CA
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeAsphaltic Emulsion Emulsion GradeSS-1h
Lot NumberNot set Sub LotNot set
Dilution Percentage RateNot set

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedDate AddedVerified?Release DateTest CommentsPrivacy LevelActions
2023-11-04-16-1AASHTO T59-16: Standard Method of Test for Emulsified Asphalts (Emulsified Asphalt Residue Evap. (Sec. 7))Humberto Ramirez, CT HQ - Sacramento Asphalt Binder Laboratory11/08/202311/08/2023
Yes
11/08/2023Public - Test Data Visible

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2023-11-04-16-1 AASHTO T59-16 (Verified)