Sample Record
Owner Lab
- CT D04 - Richmond Field Laboratory
DIME Sample ID 2023-08-19-49
Project Information
Project Identifiers | Project ID: 994803 DEA: 043J0704 EFIS: 0415000077 |
---|---|
DIST-CO-RTE-PM | 04-CC-80-10.1/13.5 |
Award Date | 03/10/2023 |
Closeout Date | Not set |
Work Description | Remove PCC and AC, place PCP and AC Resurfacing. |
Location Description | Construction on State Highway in Contra Costa County in Hercules and Crockett from Route 80/4 separation to 0.1 mile west of Crockett Viaduct. |
QA Service Level | 1 (Verified on 05/10/2023) |
Sample Information
Sample Taken Date | 08/19/2023 | Sample Unique Key | 49 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 08/19/2023 |
Sample type | Quality Assurance | A brief description of the sample | 1/2-INCH HMA-SP Type A 15%RAP |
The quantity of what the sample constitutes | N/A | From where was the sample collected | Source |
First name of sampler or witnessed by | Nick | Last name of sampler or witnessed by | Hall |
Title of sampler | Telephone number of sampler | 7072999133 | |
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | County Asphalt Batch Plant | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Hot Mix Asphalt | HMA Type | Type A HMA |
---|---|---|---|
HMA Grading | 1/2 inch | Lot number | 2 |
Sublot number | 2 | HMA Mix Number | L230620 |
Submitted Tests
Sample File Attachments
File Name | Extension | Date Uploaded | Actions |
---|---|---|---|
No results found. |
Test File Attachments
DIME Test ID: 2023-08-19-49-5 AASHTO T209-22 (Verified)
DIME Test ID: 2023-08-19-49-6 AASHTO T275-07r12 (Verified)