Sample Record

Owner Lab

  • CT D04 - Richmond Field Laboratory

DIME Sample ID 2023-08-05-62

Project Information

Project IdentifiersProject ID: 994803
DEA: 043J0704
EFIS: 0415000077
DIST-CO-RTE-PM04-CC-80-10.1/13.5
Award Date03/10/2023
Closeout DateNot set
Work DescriptionRemove PCC and AC, place PCP and AC Resurfacing.
Location DescriptionConstruction on State Highway in Contra Costa County in Hercules and Crockett from Route 80/4 separation to 0.1 mile west of Crockett Viaduct.
QA Service Level1 (Verified on 05/10/2023)

Sample Information

Sample Taken Date08/05/2023 Sample Unique Key62
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing08/05/2023
Sample typeQuality Assurance A brief description of the sampleExisting Subgrade
The quantity of what the sample constitutes2500g From where was the sample collectedJob Site
First name of sampler or witnessed byNick Last name of sampler or witnessed byHall
Title of sampler Telephone number of sampler7072999133
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameNative Material Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeSoil The fabricator's/manufacturer's product name for the sample
The fabricator/manufacturer designation for the sample A detailed description of where the material sample was collectedHWY 80 Lane 2 East Bound
Where the material sample would have been placed if not sampled

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedSubmitted ByVerified?Release DateTest CommentsActions
2023-08-05-62-2CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear GagesIGNACIO ARECHIGA, CT D04 - Richmond Field Laboratory08/05/2023IGNACIO ARECHIGA
Yes
09/12/202398%Relative Compaction Passed

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2023-08-05-62-2 CTM 231-March 2013 (Verified)