Sample Record

Owner Lab

  • CT HQ - Sacramento Concrete Testing Laboratory

DIME Sample ID 2023-05-01-50

Sample is locked from editing. info

Project Information

Project IdentifiersProject ID: 993401
DEA: 11430494
EFIS: 1118000262
DIST-CO-RTE-PM11-IMP-8-R96.8
Award Date09/01/2022
Closeout Date02/28/2024
Work DescriptionREHABILITATE BRIDGE DECK, SLABS, BEARING PADS, JOINT SEALS & OVERLAY.
Location DescriptionIMPERIAL COUNTY NEAR WINTERHAVEN AT COLORADO RIVER VIADUCT BRIDGE NO. 58-0312 L/R
QA Service Level1 (Verified on 11/30/2021)

Sample Information

Sample Taken Date05/01/2023 Sample Unique Key50
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing05/01/2023
Sample typeQuality Assurance A brief description of the sampleRapid Set
The quantity of what the sample constitutes1 bag From where was the sample collectedManufacturer
First name of sampler or witnessed byUnknown Last name of sampler or witnessed byUnknown
Title of sampler Telephone number of sampler
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameSika Corporation Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name Bid ItemNot set

Material Information

Material TypeRapid Set ManufacturerSika Corporation
Mix no.3722 Materials ReceivedSika 2500
Lot no.3006384921 Batch no.3006384921

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedDate AddedVerified?Release DateTest CommentsPrivacy LevelActions
2023-05-01-50-1CONCLP 2-16: Rapid Set Patching MaterialsPhillip Montes, CT HQ - Sacramento Concrete Testing Laboratory05/18/202306/30/2023
Yes
06/30/2023Public - Test Data Visible

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2023-05-01-50-1 CONCLP 2-16 (Verified)