Sample Record

DIME Sample ID 2023-06-29-6

Project Information

Project IdentifiersProject ID: 212737
DEA: 060S8304
EFIS: 0615000046
DIST-CO-RTE-PM06-FRE-5-44.4-45.4
Award Date05/26/2022
Closeout Date05/09/2025
Work DescriptionTUMEY GULCH ABUTMENT REHAB BR# 42-0246L/R.
Location DescriptionIN FRESNO COUNTY AT TUMEY GULCH.
QA Service Level1 (Verified on 09/25/2018)

Owner Lab

  • CT HQ - QASI Bay Area Field Office

Sample Information

Sample Taken Date06/29/2023 Sample Unique Key6
Date that the sample was received by the laboratory/organization performing the testingNot set Sample typeQuality Control
A brief description of the sampleHRC 555 headed bars The quantity of what the sample constitutes24
From where was the sample collectedFabricator First name of sampler or witnessed bySherri
Last name of sampler or witnessed byBrannon Title of samplerQA Inspector
Telephone number of sampler(916) 826-6371 Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility namePacific Steel Group Napa
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) FormB22--207-23
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeSMTL TM5 - Headed Bars Production or Authorization TestingProduction Testing
Rebar Heat Number(s)3500032060 Head Manufacturer Lot Number(s)1
Rebar Size#8 Headed Bar Model NameHRC 555
Size of HeadReduced Size - 4x Head Connection TypeForged
Head ShapeCircular Rebar ManufacturerNucor
Head ManufacturerPacific Steel Group Napa Head FabricatorPacific Steel Group Napa
Material Standard CodeASTM A706 Headed Bar Unique ID4FG-17-01

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedDate AddedVerified?Release DateTest CommentsPrivacy LevelActions
No results found.

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments