Sample Record
Owner Lab
- CT HQ - Sacramento Hot Mix Asphalt Laboratory
DIME Sample ID 2023-05-09-102
Project Information
| Project Identifiers | Project ID: 66667 DEA: JMFPP EFIS: 0019000043 |
|---|---|
| DIST-CO-RTE-PM | 59--- |
| Award Date | Not set |
| Closeout Date | Not set |
| Work Description | Special project for submitting Sample information for JMF Prequalification Program. |
| Location Description | Not set |
| QA Service Level | NOT VERIFIED |
Sample Information
| Sample Taken Date | 05/09/2023 | Sample Unique Key | 102 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 05/23/2023 | Sample type | Verification |
| A brief description of the sample | RAP | The quantity of what the sample constitutes | 2 Bags |
| From where was the sample collected | Source | First name of sampler or witnessed by | Allen |
| Last name of sampler or witnessed by | Oliver | Title of sampler | MREA |
| Telephone number of sampler | Laboratory sample identification | 023-023 | |
| Linked DIME Sample ID | 2023-05-09-101 | The fabricator/manufacturer/facility name | SPM-Avenal |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | ||
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Reclaimed Asphalt Pavement | RAP Source | Stockpile |
|---|---|---|---|
| Aggregate Size | 3/8 | Aggregate Source | |
| RAP Stockpile | Static | Stockpile Size (tons) | |
| Reclaimed Asphalt Pavement Mix Number |
Submitted Tests
Sample File Attachments
| File Name | Extension | Date Uploaded | Actions |
|---|---|---|---|
| No results found. | |||
Test File Attachments
DIME Test ID: 2023-05-09-102-1 AASHTO T30-19 (Verified)
DIME Test ID: 2023-05-09-102-2 AASHTO T209-12 (Verified)
