Sample Record
Owner Lab
- CT D06 - Bakersfield Field Laboratory
DIME Sample ID 2023-05-16-17
Sample is locked from editing. info
Project Information
Project Identifiers | Project ID: 215180 DEA: 060Q9204 EFIS: 0614000010 COOP: 061764 |
---|---|
DIST-CO-RTE-PM | 06-KER-99-10.4/21.2 |
Award Date | 12/08/2020 |
Closeout Date | Not set |
Work Description | CONSTRUCT CRCP AND HMA (TYPE A) PAVEMENT. |
Location Description | KERN COUNTY IN AND NEAR BAKERSFIELD FROM 0.4 MILE SOUTH OF OLD US 99 OVERCROSSING TO 0.1 MILE NORTH OF WHITE LANE OVERCROSSING |
QA Service Level | 1 (Verified on 09/14/2020) |
Sample Information
Sample Taken Date | 05/16/2023 | Sample Unique Key | 17 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 05/16/2023 |
Sample type | Department Acceptance | A brief description of the sample | CRCP -sample for testing |
The quantity of what the sample constitutes | 10CY truck # 1 | From where was the sample collected | Source |
First name of sampler or witnessed by | James | Last name of sampler or witnessed by | Watson |
Title of sampler | Telephone number of sampler | 6615498281 | |
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | Hwy 223 off ramp sb 99 | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Concrete | The concrete mix design number | G3-21-PCC-263 |
---|---|---|---|
The truck number from where the sample was collected | 7 | The batch plant ticket number from where the sample was collected | 1 |
Concrete batch plant | The fabricator/manufacturer designation for the sample | ||
A detailed description of where the material sample was collected | Back of Truck | Where the material sample would have been placed if not sampled | |
From Lot No. | Bag Lot No. |
Submitted Tests
Sample File Attachments
File Name | Extension | Date Uploaded | Actions |
---|---|---|---|
No results found. |
Test File Attachments
DIME Test ID: 2023-05-16-17-1 CTM 504-June 2010 (Verified)
File Name | Extension | Date Uploaded | Test ID | Actions |
---|---|---|---|---|
06-0Q9204_37085_230516_JW | 05/17/2023 | 2023-05-16-17-1 | Info |
DIME Test ID: 2023-05-16-17-2 CTM 518-June 2010 (Verified)
File Name | Extension | Date Uploaded | Test ID | Actions |
---|---|---|---|---|
06-0Q9204_37085_230516_JW | 05/17/2023 | 2023-05-16-17-2 | Info |
DIME Test ID: 2023-05-16-17-3 CTM 533-June 2010 (Verified)
File Name | Extension | Date Uploaded | Test ID | Actions |
---|---|---|---|---|
06-0Q9204_37085_230516_JW | 05/17/2023 | 2023-05-16-17-3 | Info |
DIME Test ID: 2023-05-16-17-4 CTM 557-July 2012 (Verified)