Sample Record

DIME Sample ID 2023-05-06-1

Sample is locked from editing. info

Project Information

Project IdentifiersProject ID: 993154
DEA: 120R3404
EFIS: 1218000079
DIST-CO-RTE-PM12-ORA-73-12.9/R26.8
Award Date09/16/2021
Closeout Date09/28/2023
Work DescriptionREPLACE APPROACH SLABS, JOINT SEAL, AND APPLY METHACRYLATE ON BRIDGES.
Location DescriptionORANGE COUNTY AT VARIOUS LOCATIONS FROM MOULTON PARKWAY UNDERCROSSING IN LAGUNA NIGUEL TO BRISTOL STREET UNDERCROSSING IN COSTA MESA
QA Service Level1 (Verified on 08/02/2021)

Owner Lab

  • CT D12 - Huntington Beach Field Laboratory

Sample Information

Sample Taken Date05/06/2023 Sample Unique Key1
Date that the sample was received by the laboratory/organization performing the testing05/06/2023 Sample typeQuality Assurance
A brief description of the sample6x6x18 Beam The quantity of what the sample constitutes3
From where was the sample collectedJob Site First name of sampler or witnessed byRMA Group
Last name of sampler or witnessed byRMA QC Title of sampler
Telephone number of sampler Laboratory sample identification23-0153
Linked DIME Sample ID The fabricator/manufacturer/facility nameUnknown
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeConcrete The concrete mix design numberCTS-65-EHI
The truck number from where the sample was collected The batch plant ticket number from where the sample was collected1
Concrete batch plant The fabricator/manufacturer designation for the sample
A detailed description of where the material sample was collectedConcrete from wheelbarrow Where the material sample would have been placed if not sampledNB MacArthur Blvd onramp to N 73 north of San Diego
From Lot No. Bag Lot No.

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedDate AddedVerified?Release DateTest CommentsPrivacy LevelActions
2023-05-06-1-1CTM 524-March 2013: Method of Test for Flexural Strength Of Rapid Strength ConcreteDan Morris, CT D12 - Huntington Beach Field Laboratory05/09/202305/10/2023
Yes
05/10/2023Public - Test Data Visible

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2023-05-06-1-1 CTM 524-March 2013 (Verified)
File NameExtensionDate UploadedTest IDActions
23-0153pdf05/10/20232023-05-06-1-1   Info