Sample Record
Owner Lab
- CT D02 - Yreka Field Laboratory
DIME Sample ID 2023-05-02-23
Project Information
| Project Identifiers | Project ID: 99999 DEA: 0322222 |
|---|---|
| DIST-CO-RTE-PM | 03-SAC,OMG-888,99,80-0.6-0.6 |
| Award Date | Not set |
| Closeout Date | Not set |
| Work Description | THIS PROJECT RECORD WAS ADDED FOR DIME TESTERS - DATA SUBMITTED FOR THIS PROJECT SHOULD NOT BE USED FOR ANY OTHER PURPOSES. |
| Location Description | THIS PROJECT RECORD WAS ADDED FOR DIME TESTERS - DATA SUBMITTED FOR THIS PROJECT SHOULD NOT BE USED FOR ANY OTHER PURPOSES. |
| QA Service Level | (Verified on 04/05/2013) |
Sample Information
| Sample Taken Date | 05/02/2023 | Sample Unique Key | 23 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 05/02/2023 |
| Sample type | Department Acceptance | A brief description of the sample | Minor Concrete |
| The quantity of what the sample constitutes | 60 CY | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | Danny | Last name of sampler or witnessed by | Hansen |
| Title of sampler | Material Tester | Telephone number of sampler | |
| Laboratory sample identification | 001 | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | MRM | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | 166674 | Structure unique identifier | |
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Concrete | The concrete mix design number | 505S |
|---|---|---|---|
| The truck number from where the sample was collected | 3rd truck | The batch plant ticket number from where the sample was collected | Unknown |
| Concrete batch plant | The fabricator/manufacturer designation for the sample | ||
| A detailed description of where the material sample was collected | back of truck | Where the material sample would have been placed if not sampled | sta 240 to 300 |
| From Lot No. | Bag Lot No. |
Submitted Tests
| DIME Test ID | Test Method | Tester Name, Testing Lab | Date Tested | Date Added | Verified? | Release Date | Test Comments | Privacy Level | Actions |
|---|---|---|---|---|---|---|---|---|---|
| 2023-05-02-23-1 | CTM 521-June 2020: Method of Test for Compressive Strength of Molded Concrete Cylinders | Austin Henry, CT D02 - Yreka Field Laboratory | 05/02/2023 | 05/02/2023 | No |
Sample File Attachments
| File Name | Extension | Date Uploaded | Actions |
|---|---|---|---|
| No results found. | |||
Test File Attachments
DIME Test ID: 2023-05-02-23-1 CTM 521-June 2020
