Sample Record
Owner Lab
- CT D07 - Materials Field Laboratory, Unit 1953
DIME Sample ID 2023-04-19-57
Project Information
Project Identifiers | Project ID: 214451 DEA: 07303704 EFIS: 0714000035 |
---|---|
DIST-CO-RTE-PM | 07-LA-101-8.0/27.3 |
Award Date | 12/19/2019 |
Closeout Date | 05/07/2024 |
Work Description | REPLACE CONCRETE BARRIERS. |
Location Description | THE CITY AND COUNTY OF LOS ANGELES FROM PILGRIMAGE OVERCROSSING TO VALLEY CIRCLE BOULEVARD OVERCROSSING |
QA Service Level | 1 (Verified on 08/12/2020) |
Sample Information
Sample Taken Date | 04/19/2023 | Sample Unique Key | 57 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 04/21/2023 |
Sample type | Department Acceptance | A brief description of the sample | 3/4" hma - a220831 sva sjr |
The quantity of what the sample constitutes | 750 Tons | From where was the sample collected | Job Site |
First name of sampler or witnessed by | Nathan | Last name of sampler or witnessed by | B |
Title of sampler | RMA tester | Telephone number of sampler | |
Laboratory sample identification | 23-079 | Linked DIME Sample ID | |
The fabricator/manufacturer/facility name | AAA Irwindale | Transportation Laboratory (TL) Number | na |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Hot Mix Asphalt | HMA Type | Type A HMA |
---|---|---|---|
HMA Grading | 3/4 inch | Lot number | 1 |
Sublot number | HMA Mix Number |
Submitted Tests
Sample File Attachments
File Name | Extension | Date Uploaded | Actions |
---|---|---|---|
No results found. |
Test File Attachments
DIME Test ID: 2023-04-19-57-1 AASHTO T275-07r12 (Verified)