Sample Record
Owner Lab
- CT D10 - District 10 Materials Laboratory
DIME Sample ID 2023-04-18-66
Project Information
Project Identifiers | Project ID: 994509 DEA: 101R4004 EFIS: 1023000140 |
---|---|
DIST-CO-RTE-PM | 10-MER,MER/MER-5,59,152-22.6/32.5 |
Award Date | 02/09/2023 |
Closeout Date | 06/26/2023 |
Work Description | Not set |
Location Description | Not set |
QA Service Level | 1 (Verified on 05/10/2023) |
Sample Information
Sample Taken Date | 04/18/2023 | Sample Unique Key | 66 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 04/19/2023 |
Sample type | Quality Assurance | A brief description of the sample | 3/4 HMA |
The quantity of what the sample constitutes | 4 boxes | From where was the sample collected | Manufacturer |
First name of sampler or witnessed by | Trevan | Last name of sampler or witnessed by | Fulkerson |
Title of sampler | Lab Technician | Telephone number of sampler | |
Laboratory sample identification | 23-H-58 | Linked DIME Sample ID | |
The fabricator/manufacturer/facility name | GRI, Munn & Perkins | Transportation Laboratory (TL) Number | 644748 |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Hot Mix Asphalt | HMA Type | Type A HMA |
---|---|---|---|
HMA Grading | 3/4 inch | Lot number | 2 |
Sublot number | 19 | HMA Mix Number | 23J001 |
Submitted Tests
Sample File Attachments
File Name | Extension | Date Uploaded | Actions |
---|---|---|---|
No results found. |
Test File Attachments
DIME Test ID: 2023-04-18-66-1 AASHTO T209-12 (Verified)
DIME Test ID: 2023-04-18-66-2 AASHTO T308-10 (Verified)