Sample Record
Owner Lab
- CT D01 - Crescent City Field Laboratory
DIME Sample ID 2023-04-11-8
Project Information
| Project Identifiers | Project ID: 215620 DEA: 01436404 EFIS: 0100000193 |
|---|---|
| DIST-CO-RTE-PM | 01-DN-101-35.8/36.5 |
| Award Date | 07/11/2022 |
| Closeout Date | Not set |
| Work Description | Dr. Fine Bridge Replacement |
| Location Description | DR. FINE BRIDGE REPLACEMENT FROM LAKE EARL DR TO S FRED D. HAIGHT DR ON HWY 101 ACROSS SMITH RIVER. |
| QA Service Level | 1 (Verified on 03/26/2021) |
Sample Information
| Sample Taken Date | 04/11/2023 | Sample Unique Key | 8 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 04/12/2023 |
| Sample type | Verification | A brief description of the sample | 4000 psi concrete |
| The quantity of what the sample constitutes | 300 CYS | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | Tance | Last name of sampler or witnessed by | Singletary |
| Title of sampler | ASR | Telephone number of sampler | 4074628500 |
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | Tidewater Starry pit | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | 01-0041 temporary bridge | |
| Structure name | Smith River bridge | Bid Item | Not set |
Material Information
| Material Type | Concrete | The concrete mix design number | SR-Min ST NA |
|---|---|---|---|
| The truck number from where the sample was collected | 111 | The batch plant ticket number from where the sample was collected | 58167 |
| Concrete batch plant | Tidewater Starry | The fabricator/manufacturer designation for the sample | batch |
| A detailed description of where the material sample was collected | Back of Truck | Where the material sample would have been placed if not sampled | Abutment 1 LT |
| From Lot No. | Bag Lot No. |
Submitted Tests
| DIME Test ID | Test Method | Tester Name, Testing Lab | Date Tested | Date Added | Verified? | Release Date | Test Comments | Privacy Level | Actions |
|---|---|---|---|---|---|---|---|---|---|
| 2023-04-11-8-1 | CTM 521-June 2020: Method of Test for Compressive Strength of Molded Concrete Cylinders | Joshua Erler, CT D01 - Crescent City Field Laboratory | 05/09/2023 | 05/12/2023 | No | 28 day break |
Sample File Attachments
| File Name | Extension | Date Uploaded | Actions |
|---|---|---|---|
| No results found. | |||
Test File Attachments
DIME Test ID: 2023-04-11-8-1 CTM 521-June 2020