Sample Record
DIME Sample ID 2023-03-24-2
Project Information
| Project Identifiers | Project ID: 215188 DEA: 080F5434 EFIS: 0817000239 Permit Numbers: 0823NMC0369 |
|---|---|
| DIST-CO-RTE-PM | 08-RIV-I-15,SR-91-6.1-7.6 |
| Award Date | 03/11/2020 |
| Closeout Date | 06/05/2024 |
| Work Description | I-15 ELC: 15/91 Express Lanes Connector Project (ELC) |
| Location Description | Junction of I-15 and SR-91 in Corona, CA |
| QA Service Level | 1 (Verified on 09/16/2020) |
Owner Lab
- CT D08 - Fontana Southern Regional Laboratory
Sample Information
| Sample Taken Date | 03/24/2023 | Sample Unique Key | 2 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 03/17/2022 | Sample type | Quality Assurance |
| A brief description of the sample | CONCRETE CYLINDERS | The quantity of what the sample constitutes | 4 |
| From where was the sample collected | Job Site | First name of sampler or witnessed by | Idris Najjar and |
| Last name of sampler or witnessed by | Mohammed Haque | Title of sampler | CT Inspector |
| Telephone number of sampler | Laboratory sample identification | 1026-243 | |
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | Myers - Rados Joint Venture | |
| Transportation Laboratory (TL) Number | 1 | Inspector Lot Number from the Transportation Laboratory (TL) Form | |
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Concrete | The concrete mix design number | 1610887 |
|---|---|---|---|
| The truck number from where the sample was collected | 10070491 | The batch plant ticket number from where the sample was collected | 30668937 |
| Concrete batch plant | Cemex Fontana | The fabricator/manufacturer designation for the sample | |
| A detailed description of where the material sample was collected | WB 91 Temescal OH Frame 2 and 3 LOAD 2 | Where the material sample would have been placed if not sampled | |
| From Lot No. | Bag Lot No. |
Submitted Tests
Sample File Attachments
| File Name | Extension | Date Uploaded | Actions |
|---|---|---|---|
| No results found. | |||
Test File Attachments
DIME Test ID: 2023-03-24-2-1 ASTM C39-10 (Verified)
DIME Test ID: 2023-03-24-2-2 ASTM C39-10 (Verified)