Sample Record

DIME Sample ID 2023-02-10-59

Sample is locked from editing. info

Project Information

Project IdentifiersProject ID: 208973
DEA: 120H1004
EFIS: 1200000180
COOP: 120670
DIST-CO-RTE-PM12-ORA-405,73,405,605-9.3/24.3
Award Date11/07/2016
Closeout DateNot set
Work Description(Alternative Delivery) San Diego Freeway (I-405) Improvement Project SR-73 to I-605, Design Build Project, Administered by Orange County Transportation Authority, Caltrans METS to perform Source Inspection per RFP.
Location DescriptionOrange and Los Angeles Counties: 12-ORA-405 PM 9.3/24.2 / 07-LA-405 PM 0.0/1.2 12-ORA-22 PM R0.7/R3.8 / 12-ORA-22 PM R0.5/R0.7 12-ORA-73 PM R27.2/R27.8 / 12-ORA-605 PM 3.5/R1.6 07-LA-605 PM R0.0/R1.2
QA Service Level1 (Verified on 09/10/2015)

Owner Lab

  • CT D12 - Huntington Beach Field Laboratory

Sample Information

Sample Taken Date02/10/2023 Sample Unique Key59
Date that the sample was received by the laboratory/organization performing the testing02/10/2023 Sample typeQuality Assurance
A brief description of the sampleConcrete beams The quantity of what the sample constitutes2
From where was the sample collectedJob Site First name of sampler or witnessed byCuong
Last name of sampler or witnessed byDo Title of sampler
Telephone number of sampler7143066148 Laboratory sample identification23-0039
Linked DIME Sample ID The fabricator/manufacturer/facility nameAssociated / Fountain Valley
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeConcrete The concrete mix design numberCT675CP
The truck number from where the sample was collected The batch plant ticket number from where the sample was collected1
Concrete batch plant The fabricator/manufacturer designation for the sample
A detailed description of where the material sample was collectedSB 405 Median Between Edwards and Goldenwest Where the material sample would have been placed if not sampled
From Lot No. Bag Lot No.

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedDate AddedVerified?Release DateTest CommentsPrivacy LevelActions
2023-02-10-59-1CTM 523-May 2020: Method of Test for Flexural Strength of ConcreteDan Morris, CT D12 - Huntington Beach Field Laboratory03/10/202303/13/2023
Yes
05/15/2023Public - Test Data Visible

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2023-02-10-59-1 CTM 523-May 2020 (Verified)
File NameExtensionDate UploadedTest IDActions
23-0039pdf03/13/20232023-02-10-59-1   Info