Sample Record

Owner Lab

  • Pavement Engineers

DIME Sample ID 2023-03-06-19

Project Information

Project IdentifiersProject ID: 993333
DEA: 04264724
EFIS: 0419000068
DIST-CO-RTE-PM04-MRN-101-R20.8/27.1
Award Date04/26/2022
Closeout DateNot set
Work DescriptionCIP BRIDGES, CONSTRUCT ROADWAY, RETAINING WALLS AND MODIFY ELECTRICAL.
Location DescriptionMARIN COUNTY IN AND NEAR NOVATO FROM 0.1 MILE SOUTH OF FRANKLIN AVENUE OVERHEAD TO 0.5 MILE SOUTH OF SAN ANTONIO CREEK BRIDGE
QA Service Level1 (Verified on 11/01/2021)

Sample Information

Sample Taken Date03/06/2023 Sample Unique Key19
Date that the sample was received by the laboratory/organization performing the testing03/06/2023 Sample typeQuality Control
A brief description of the sampleconcrete aggregate The quantity of what the sample constitutes14 yards
From where was the sample collectedSupplier First name of sampler or witnessed byRoland
Last name of sampler or witnessed byOcansey Title of samplerLab Technician
Telephone number of sampler Laboratory sample identificationL230267
Linked DIME Sample ID The fabricator/manufacturer/facility nameShamrock Petaluma
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure nameOlive St Bridge Closure
Bid ItemNot set

Material Information

Material TypeAggregate Source Identification (SMARA, name of Pit or Job Site)Shamrock Petaluma
The fabricator's/manufacturer's product name for the sample3728LV The fabricator/manufacturer designation for the sample3728LV
The plant number A detailed description of where the material sample was collectedstockpile
Where the material sample would have been placed if not sampledconcrete Primary Aggregate Nominal Size1 inch
The concrete mix design number3728LV Lot number
Sublot number Aggregate Mix Number

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedDate AddedVerified?Release DateTest CommentsPrivacy LevelActions
2023-03-06-19-1CTM 202-November 2011: Method of Test for Sieve Analysis of Fine and Coarse AggregatesRoland Ocansey, Pavement Engineers03/08/202303/09/2023
Yes
03/09/2023Public - Test Data Visible
2023-03-06-19-2CTM 202-November 2011: Method of Test for Sieve Analysis of Fine and Coarse AggregatesRoland Ocansey, Pavement Engineers03/08/202303/09/2023
Yes
03/09/2023Public - Test Data Visible
2023-03-06-19-3CTM 202-November 2011: Method of Test for Sieve Analysis of Fine and Coarse AggregatesRoland Ocansey, Pavement Engineers03/08/202303/09/2023
Yes
03/09/2023Public - Test Data Visible
2023-03-06-19-4CTM 217-June 2011: Method of Test for Sand EquivalentMichelle Holub, Pavement Engineers03/08/202303/09/2023
Yes
03/09/2023Public - Test Data Visible
2023-03-06-19-5CTM 227-December 2014: Method of Test for Evaluating Cleanness of Coarse Aggregate (Cleanness)Roland Ocansey, Pavement Engineers03/08/202303/09/2023
Yes
03/09/2023Public - Test Data Visible

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2023-03-06-19-1 CTM 202-November 2011 (Verified)
DIME Test ID: 2023-03-06-19-2 CTM 202-November 2011 (Verified)
DIME Test ID: 2023-03-06-19-3 CTM 202-November 2011 (Verified)
DIME Test ID: 2023-03-06-19-4 CTM 217-June 2011 (Verified)
DIME Test ID: 2023-03-06-19-5 CTM 227-December 2014 (Verified)