Sample Record
DIME Sample ID 2023-02-10-57
Project Information
| Project Identifiers | Project ID: 215486 DEA: 040A0204 EFIS: 0400000129 |
|---|---|
| DIST-CO-RTE-PM | 04-SON-1-15-15.7 |
| Award Date | 05/04/2021 |
| Closeout Date | Not set |
| Work Description | Construct roadway and bridge with structural concrete and CIDH piling |
| Location Description | District-County-Route-Post Mile: 04-Son-1-R15.0/R15.7 |
| QA Service Level | 1 (Verified on 04/08/2022) |
Owner Lab
- CT D04 - Petaluma Field Laboratory
Sample Information
| Sample Taken Date | 02/10/2023 | Sample Unique Key | 57 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 02/10/2023 | Sample type | Quality Assurance |
| A brief description of the sample | RAP | The quantity of what the sample constitutes | 1 bag |
| From where was the sample collected | Manufacturer | First name of sampler or witnessed by | Anthony |
| Last name of sampler or witnessed by | Valdez | Title of sampler | Plant QC |
| Telephone number of sampler | Laboratory sample identification | ||
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | Bodean - Santa Rosa | |
| Transportation Laboratory (TL) Number | 861617 | Inspector Lot Number from the Transportation Laboratory (TL) Form | |
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Reclaimed Asphalt Pavement | RAP Source | Bodean Santa Rosa |
|---|---|---|---|
| Aggregate Size | 3/8 | Aggregate Source | |
| RAP Stockpile | Continuous | Stockpile Size (tons) | |
| Reclaimed Asphalt Pavement Mix Number |
Submitted Tests
| DIME Test ID | Test Method | Tester Name, Testing Lab | Date Tested | Date Added | Verified? | Release Date | Test Comments | Privacy Level | Actions |
|---|---|---|---|---|---|---|---|---|---|
| No results found. | |||||||||
Sample File Attachments
| File Name | Extension | Date Uploaded | Actions |
|---|---|---|---|
| No results found. | |||
