Sample Record

DIME Sample ID 2022-06-14-66

Sample is locked from editing. info

Project Information

Project IdentifiersProject ID: 215348
DEA: 060U4204
EFIS: 0616000004
DIST-CO-RTE-PM06-FRE-99-R4.9/11.6
Award Date02/25/2021
Closeout Date12/02/2025
Work DescriptionCONSTRUCT CRCP, PLACE HMA, AND ROADWAY EXCAVATION.
Location DescriptionFRESNO COUNTY IN AND NEAR SELMA AND FOWLER FROM MCCALL AVENUE UNDERCROSSING TO 0.5 MILE NORTH OF MERCED STREET UNDERCROSSING
QA Service Level1 (Verified on 12/07/2020)

Owner Lab

  • G3 Quality, Incorporated - Cerritos

Sample Information

Sample Taken Date06/14/2022 Sample Unique Key66
Date that the sample was received by the laboratory/organization performing the testing06/15/2022 Sample typeQuality Control
A brief description of the sample6X12 cylinders The quantity of what the sample constitutes2
From where was the sample collectedJob Site First name of sampler or witnessed byAlvaro
Last name of sampler or witnessed byPineda Title of samplerQC Field Technician
Telephone number of sampler Laboratory sample identificationSet 1
Linked DIME Sample IDUnknown The fabricator/manufacturer/facility nameJob Site
Transportation Laboratory (TL) NumberUnknown Inspector Lot Number from the Transportation Laboratory (TL) FormUnknown
Structure unique identifier00-0000 Structure name
Bid ItemNot set

Material Information

Material TypeConcrete The concrete mix design numberND10531
The truck number from where the sample was collectedLoad 2 The batch plant ticket number from where the sample was collected0
Concrete batch plantBuilders Concrete The fabricator/manufacturer designation for the sampleSet 1
A detailed description of where the material sample was collectedNB RTE 99 at Merced Bridge STA 397.60 Where the material sample would have been placed if not sampledUnknown
From Lot No.Unknown Bag Lot No.Unknown

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedDate AddedVerified?Release DateTest CommentsPrivacy LevelActions
2022-06-14-66-1CTM 521-June 2020: Method of Test for Compressive Strength of Molded Concrete CylindersDavid Silva, G3 Quality, Incorporated - Cerritos07/12/202202/25/2023
Yes
02/25/2023Public - Test Data Visible
2022-06-14-66-2CTM 557-June 2020: Method of Test for Temperature of Freshly Mixed Hydraulic Cement ConcreteAlvaro Pineda, G3 Quality, Incorporated - Cerritos06/14/202202/25/2023
Yes
02/25/2023Public - Test Data Visible
2022-06-14-66-3CTM 518-June 2010: Method of Test for Unit Weight of Fresh ConcreteAlvaro Pineda, G3 Quality, Incorporated - Cerritos06/14/202202/25/2023
Yes
02/25/2023Public - Test Data Visible
2022-06-14-66-4CTM 504-June 2010: Method of Test for Determining Air Content of Freshly Mixed Concrete by the Pressure MethodAlvaro Pineda, G3 Quality, Incorporated - Cerritos06/14/202202/25/2023
Yes
02/25/2023Public - Test Data Visible
2022-06-14-66-5CTM 556-January 2018: Method of Test for Slump of Fresh Portland Cement ConcreteAlvaro Pineda, G3 Quality, Incorporated - Cerritos06/14/202202/25/2023
Yes
02/25/2023Public - Test Data Visible

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2022-06-14-66-1 CTM 521-June 2020 (Verified)
DIME Test ID: 2022-06-14-66-2 CTM 557-June 2020 (Verified)
DIME Test ID: 2022-06-14-66-3 CTM 518-June 2010 (Verified)
DIME Test ID: 2022-06-14-66-4 CTM 504-June 2010 (Verified)
DIME Test ID: 2022-06-14-66-5 CTM 556-January 2018 (Verified)