Sample Record

Owner Lab

  • CT D05 - Carpinteria Field Laboratory

DIME Sample ID 2023-01-30-32

Project Information

Project IdentifiersProject ID: 215753
DEA: 050N72U4
EFIS: 0520000169
DIST-CO-RTE-PM05-SB-101-4.4/R7.7
Award Date06/05/2021
Closeout DateNot set
Work DescriptionPlease cc Office Engineer Ni Nyoman Paul on reports sent to RE and SR. Construct High Occupancy Vehicle (HOV) lanes on U.S. Route 101 and rehabilitation - Segment 4B.
Location Description101 freeway in Summerland, CA
QA Service Level1 (Verified on 05/06/2021)

Sample Information

Sample Taken Date01/30/2023 Sample Unique Key32
Date that the sample was received by the laboratory/organization performing the testing01/30/2023 Sample typeQuality Assurance
A brief description of the sampleCRCP Concrete The quantity of what the sample constitutes430 CY
From where was the sample collectedSupplier First name of sampler or witnessed byDorell
Last name of sampler or witnessed byHarper Title of sampler
Telephone number of sampler6692889248 Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nameGranite Portable Plant at Padaro
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeConcrete The concrete mix design number231
The truck number from where the sample was collected1982 The batch plant ticket number from where the sample was collected11720
Concrete batch plantGranite Portable Plant The fabricator/manufacturer designation for the sample
A detailed description of where the material sample was collectedDischarge from concrete truck into wheelbarrow. Where the material sample would have been placed if not sampled
From Lot No. Bag Lot No.

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedDate AddedVerified?Release DateTest CommentsPrivacy LevelActions
2023-01-30-32-1CTM 504-June 2010: Method of Test for Determining Air Content of Freshly Mixed Concrete by the Pressure MethodDorell Harper, CT D05 - Carpinteria Field Laboratory01/30/202302/13/2023
Yes
02/13/2023Public - Test Data Visible

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2023-01-30-32-1 CTM 504-June 2010 (Verified)