Sample Record

DIME Sample ID 2023-01-12-14

Sample is locked from editing. info

Project Information

Project IdentifiersProject ID: 993124
DEA: 101F1704
EFIS: 1016000032
DIST-CO-RTE-PM10-SJ-26,99-1.1,19.3
Award Date09/07/2021
Closeout Date08/30/2023
Work DescriptionREMOVE AND REPLACE BRIDGE.
Location DescriptionSAN JOAQUIN COUNTY NEAR STOCKTON AT ROUTE 26/99 SEPARATION
QA Service Level1 (Verified on 07/23/2021)

Owner Lab

  • RMA Group - Rancho Cordova

Sample Information

Sample Taken Date01/12/2023 Sample Unique Key14
Date that the sample was received by the laboratory/organization performing the testing01/12/2023 Sample typeQuality Control
A brief description of the sampleConcrete The quantity of what the sample constitutes100 cy
From where was the sample collectedJob Site First name of sampler or witnessed byErik
Last name of sampler or witnessed byHaagensen Title of sampler
Telephone number of sampler Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nameCemex
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeConcrete The concrete mix design number161736
The truck number from where the sample was collected The batch plant ticket number from where the sample was collected30593351
Concrete batch plant The fabricator/manufacturer designation for the sample
A detailed description of where the material sample was collectedsouth west section of bridge Where the material sample would have been placed if not sampled
From Lot No. Bag Lot No.

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedDate AddedVerified?Release DateTest CommentsPrivacy LevelActions
2023-01-12-14-1CTM 557-June 2020: Method of Test for Temperature of Freshly Mixed Hydraulic Cement ConcreteErik Haagensen, RMA Group - Rancho Cordova01/12/202301/16/2023
Yes
01/16/2023Public - Test Data Visible
2023-01-12-14-2ASTM C143-20: Standard Test Method for Slump of Hydraulic-Cement ConcreteErik Haagensen, RMA Group - Rancho Cordova01/12/202301/16/2023
Yes
01/16/2023Public - Test Data Visible
2023-01-12-14-3CTM 521-June 2020: Method of Test for Compressive Strength of Molded Concrete CylindersTodd Strait, RMA Group - Rancho Cordova01/18/202301/18/2023
Yes
01/18/2023Public - Test Data Visible
2023-01-12-14-4CTM 521-June 2020: Method of Test for Compressive Strength of Molded Concrete CylindersTodd Strait, RMA Group - Rancho Cordova02/09/202302/11/2023
Yes
02/11/2023Public - Test Data Visible

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2023-01-12-14-1 CTM 557-June 2020 (Verified)
DIME Test ID: 2023-01-12-14-2 ASTM C143-20 (Verified)
DIME Test ID: 2023-01-12-14-3 CTM 521-June 2020 (Verified)
DIME Test ID: 2023-01-12-14-4 CTM 521-June 2020 (Verified)