Sample Record
DIME Sample ID 2022-11-03-65
Project Information
| Project Identifiers | Project ID: 215129 DEA: 050N73U4 EFIS: 0520000166 |
|---|---|
| DIST-CO-RTE-PM | 05-SB-101-7.3/9.6 |
| Award Date | 10/22/2020 |
| Closeout Date | 12/11/2023 |
| Work Description | !!Please CC Office Engineer Gabrielle Herrera on reports to RE and SR!! Segment 4C - Summerland: Construct HOV lanes and rehabilitation. Source inspection of sign structure trusses, lighting structures, steel soldier piles, epoxy coated rebar, |
| Location Description | SUMMERLAND FROM 0.2 MILES NORTH OF PARDARO LANE OVERCROSSING TO SAN YSIDRO CREEK BRIDGE |
| QA Service Level | 1 (Verified on 08/24/2020) |
Owner Lab
- CT D08 - Fontana Southern Regional Laboratory
Sample Information
| Sample Taken Date | 11/03/2022 | Sample Unique Key | 65 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 12/07/2022 | Sample type | Verification |
| A brief description of the sample | 3/4" HMA-A-SP R25 | The quantity of what the sample constitutes | 4 Bags Of Agg., 1 Bag Rap |
| From where was the sample collected | Manufacturer | First name of sampler or witnessed by | Antonio |
| Last name of sampler or witnessed by | Ramirez | Title of sampler | |
| Telephone number of sampler | Laboratory sample identification | 0767A-22 | |
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | Belt Cut at Granite Buellton | |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | ||
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | 91-42-0006 |
|---|---|---|---|
| The fabricator's/manufacturer's product name for the sample | The fabricator/manufacturer designation for the sample | ||
| The plant number | 13960 | A detailed description of where the material sample was collected | Belt Cut at Granite Buellton |
| Where the material sample would have been placed if not sampled | Asphalt Paving | Primary Aggregate Nominal Size | 3/4 inch |
| The concrete mix design number | Lot number | ||
| Sublot number | Aggregate Mix Number |
Submitted Tests
Sample File Attachments
| File Name | Extension | Date Uploaded | Actions |
|---|---|---|---|
| No results found. | |||
Test File Attachments
DIME Test ID: 2022-11-03-65-1 AASHTO T27-14 (Verified)
DIME Test ID: 2022-11-03-65-2 AASHTO T84-14 (Verified)
DIME Test ID: 2022-11-03-65-3 AASHTO T85-13 (Verified)
DIME Test ID: 2022-11-03-65-6 AASHTO T304-11 (Verified)
DIME Test ID: 2022-11-03-65-9 CTM 202-November 2011 (Verified)
DIME Test ID: 2022-11-03-65-10 CTM 202-November 2011 (Verified)